Laserfiche WebLink
KOM <br /> Contact Water System UC-5 Removal-Project — Stockton, CA Terminal <br /> IFC 7/22/19 <br /> panels to the new starters for a breaker tripped, overload tripped, motor <br /> on, and motor running signals. <br /> 10 Provide new control wiring for, level switch, and-leak detection sensors <br /> etc . . <br /> 1-1 . Reprogram - lex-I/O panel as required for new equipment. <br /> 12 . Make final change over connections from existing pump motor to new <br /> during schedtifed"downthne. <br /> 13 . Demo any unused raceways after final change over to new contact water <br /> pump system: <br /> Material-Provided-By-Owner <br /> • One ( l,) Bravo 96T frbetglass sump. <br /> • One ( 1 ) Flowserve Model 1E3x2SP-62RV, 200 gpm/60 ft, 7 . 5 hp/3600 rpm pump <br /> with motor, coupling, coupling guard; float switch and mounting .plate . <br /> Material Provided By Contractor <br /> Material furnished by Contractor shall be new, sound, and free from defects and shall be <br /> obtained only from acceptable suppliers . <br /> • Piping and fittings. <br /> • Valves <br /> • All Electrical and control wiring, raceways, fittings and MCC starter equipment <br /> Building/Electrical Permits <br /> ° <br /> Contractor is aespon'sibl'e ,for:identifying andobtaining sequ iced building ng and <br /> electrical permits. and plan eheck ,with the City planning department. <br /> • Contractors to include permit cost and coordination in construction costs . <br /> Shell 6'ip�;inle Company LP Page 3 of 3 <br /> Exhibit "A " - scope of Work - Rev. A <br />