My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
REMOVAL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 7:17:11 PM
Creation date
6/1/2020 10:58:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2020
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KOM <br /> Contact Water System UC-5 Removal-Project — Stockton, CA Terminal <br /> IFC 7/22/19 <br /> panels to the new starters for a breaker tripped, overload tripped, motor <br /> on, and motor running signals. <br /> 10 Provide new control wiring for, level switch, and-leak detection sensors <br /> etc . . <br /> 1-1 . Reprogram - lex-I/O panel as required for new equipment. <br /> 12 . Make final change over connections from existing pump motor to new <br /> during schedtifed"downthne. <br /> 13 . Demo any unused raceways after final change over to new contact water <br /> pump system: <br /> Material-Provided-By-Owner <br /> • One ( l,) Bravo 96T frbetglass sump. <br /> • One ( 1 ) Flowserve Model 1E3x2SP-62RV, 200 gpm/60 ft, 7 . 5 hp/3600 rpm pump <br /> with motor, coupling, coupling guard; float switch and mounting .plate . <br /> Material Provided By Contractor <br /> Material furnished by Contractor shall be new, sound, and free from defects and shall be <br /> obtained only from acceptable suppliers . <br /> • Piping and fittings. <br /> • Valves <br /> • All Electrical and control wiring, raceways, fittings and MCC starter equipment <br /> Building/Electrical Permits <br /> ° <br /> Contractor is aespon'sibl'e ,for:identifying andobtaining sequ iced building ng and <br /> electrical permits. and plan eheck ,with the City planning department. <br /> • Contractors to include permit cost and coordination in construction costs . <br /> Shell 6'ip�;inle Company LP Page 3 of 3 <br /> Exhibit "A " - scope of Work - Rev. A <br />
The URL can be used to link to this page
Your browser does not support the video tag.