My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
REMOVAL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 7:17:11 PM
Creation date
6/1/2020 10:58:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2020
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHELL SSTOCKTON TERMINAL <br /> October 24, 2019 <br /> Site Safety Plan <br /> monitor shat} be bump tested daily and calibration reports availed upon request. <br /> The contractor must supply his/her own LEL meter when requesting a HW permit. <br /> The contactor Foremen must be accompanied by Shell operations toperform your final <br /> walk around before signing out. <br /> HE AWARE DF CHANGING AMBIENT CONDITIONS:: <br /> It may be necessary to adjust work schedule and number of breaks in order to prevent <br /> heat exhaustion or strokes. Mandatory rest breaks will be implemented in temperature <br /> over 100 degrease Work site may also get windy so pay attention to securing manpower <br /> and equipment to prevent falling or blowing objects. <br /> TERMINAL OPERATIONS : <br /> This is a. working Shell Terminal. Be aware of periodic heavy truck traffic in and around <br /> the terminal. Give the trucks the right= of way and wide berth to move their trucks and <br /> trailers. If you are asked to shut down work, do not take offense. Please understand that <br /> your safety and Shell' s business takepriorityover yourpersonalfeelings. Most of all : <br /> Communicate. Bad things happen when you assume, or you start work not knowing what <br /> conditions exist at your j ob site. If you have questions or concerns, contact the Terminal <br /> Operators or the Shell Project Representative before starting the work. Remember you <br /> are an empowered valuedcontractemployee with the power to use your Stop Work <br /> Authority ! <br /> QUESTIONS OR COMMENTS : <br /> All questions or comments concerning any part of this project should be directed to <br /> Aaron Swot , <br /> Aaron Swol can be reached' at: Cell 707-764 - 1409 <br /> Contractor must sign and agree that all contract employees have read and understand this <br /> Project Safety Plan. <br /> i <br /> REV 10/24/2019 Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.