My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 3:21:52 PM
Creation date
6/1/2020 11:43:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5) Dipstkk number(X)=82' <br />Tank diameter (Y) = 92' <br />(Y) -(X)=(2) (92'-82'=10') <br />(Z)=10' <br />6) (2)-2'=C 00'-2'=8') <br />C=8' <br />7) Is 8' less than 6-1/2'7 <br />NO Measure the distance from the top of the FSA - <br />400 Face Seal Adaptor installed on the riser pipe <br />to the Inside, top lip of the storage tank and ob- <br />tain measurement (A). <br />Upper tube length = C + (A) <br />Fortestable models only, ending In *T-. Upper Tube <br />Length . C +(A) -1.112' <br />ASSEMBLY INSTRUCTIONS <br />IMPORTANT: Each of the numbered steps In the Instal- <br />lation instructions are designed as a CHECK LIST to en- <br />sure proper Installation and trouble free operation of <br />the DPW 71 SO Overfill Prevention Valve. <br />Read and follow these steps carefully, checking them <br />off as you proceed. <br />Figure numbers correspond to step numbers for easy <br />reference. <br />STEP 1: MEASURE <br />Install the DPW Face Seal Adaptor and the DPW Thread - <br />on Spill Container on the FIII Riser (Refer to the Installa- <br />tion Instructions Supplied with the Spill Container). In- <br />sert a tape measure through the riser pipe and hook it <br />under the inside of the tank in the lengthwise direction. <br />Measure the distance from the top ofthe Face Seal <br />Adaptor threads Inside the base of the spill container <br />bucketfust below the draln valve outlet window to the <br />Inside, top lip of the storage tank (Dim. 'A) (See Figure <br />1 &1A). <br />The top flange on the 71 SO will rest on the Face Seal <br />Adaptor lust below the drain valve outlet, and be <br />locked in place between the Face Seal Adaptor and the <br />4- nipple that Is Installed in the spill container with the <br />Jack Screw Kit (See Figure l A). (For riser pipe configu- <br />rations other than that shown, consult Installation <br />drawings or use other necessary means to measure Di- <br />menslon'A'). <br />Using a tape measure, measure the distance from the <br />STEP 6: APPLY GREASE TO DROP TUBE <br />Apply black moly grease to the inside diameter of the <br />upper drop tube. Make sure coverage is completely <br />around the tube as shown In Figure 6. <br />Figure 6 <br />STEP 7: APPLY GREASE TO POLYPAK SEAL <br />Ensure that the polypak seal Is installed on the Inlet <br />tube with the lip up as shown In Figure 7. Apply black <br />moly grease to the polypak as shown. Make sure cover- <br />age Is completely around the polypak seal. <br />Ensure polypak <br />lip Is up \ <br />WO <br />Tub rl I Rry <br />Appy green <br />around pdypek <br />Figure? <br />STEPS: INSTALL INLET TUBE <br />Insert the inlet tube Into the upper tube until the upper <br />tube seatsagainst the flange on the Inlet tube. Ensure <br />polypak is Inserted evenly and stays In inlet tube <br />groove. <br />top of the Face Seal Adaptor In the spill container to the <br />bottom of the tank (Dim.'B"). <br />IMPORTANT: Inspect the riser pipe for any foreign ma- <br />terial. Over spray from tank relining or any internal <br />burn Inside of pipe must be removed prior to Installa- <br />tion. Failure to have an unobstructed riser pipe may <br />prevent proper Installation and operation of the valve. <br />The 71 SO Is designed for Installation Into schedule 40 <br />riser pipes. The 71 SO cannot be Installed Into schedule <br />80 riser pipes. <br />STEP 2: MARK THE TUBE <br />Use the result from Step 1 and HOW TO LOCATE THE <br />POSITION OF THE 7ISO AT 9S%TANK CAPACITY to <br />mark the upper tube. Measure the distance from the <br />seam where the upper tube and valve body meet. Use <br />a tape measure to mark the calculated upper tube <br />length onto the upper tube. See Figure 2. <br />Figure 1 <br />Ir NPT <br />12'wlde <br />Tap*--- <br />R as Pip. <br />with the 71 SO -TOOL is In the correct position before <br />able valves <br />wan Faro <br />NI <br />S. A.F. <br />ToTank lel <br />Jack Screw <br />Topll.D.I TO Tank <br />before drilling. <br />Hol m <br />for JatkSaew <br />blebbn <br />9 <br />O-Rng Seal <br />Figure 1 <br />Figure IA <br />3 <br />Figures <br />NOTE: Testable inlet tube must have cable port in <br />line with float. Testable inlet tube bottoms out on <br />stop, it does not bottom out on inlet flange. SeeFig- <br />e AA <br />• Cable port must be in <br />line with float <br />Figure 9A <br />Testable Models Only <br />SEE PAGE 8 FOR INSTRUCTIONS USING THE 71So- <br />TOOL. <br />SEE PAGE 9 FOR INSTRUCTIONS USING THE 71 SO- <br />TOOL4 <br />SEE PAGE 10 FOR INSTRUCTIONS USING THE 71SO- <br />ir � e <br />Nostable 7150 modeh ending with a -'require the <br />77SO-TOOLCT.,.aMred 7150 -TOOL ar ?ISO- TOOLC <br />Tape measure <br />Mark Upper Tube <br />(Cut Una) <br />Seam <br />Figure 2 <br />STEP 3: CUT THE UPPER DROP TUBE <br />Attach the supplied band clamp to the upper tube Just <br />below the mark and ensure that It Is assembled square <br />to the tube. The clamp can be used as a guide for mak- <br />ing a square cut. If a vise Is used, clamp on the valve <br />body casting only to avoid damage to the float and <br />tubes (See Figura 3A). Carefully saw through the tube <br />squarely, at the mark made In Step 2. Use a hacksaw <br />with a new fine-tooth blade. Rotating the upper tube <br />as the sawing progresses will minimize run out and en- <br />sure a square Wdegree cut Remove the band clamp <br />after tube Is cut. <br />CAUTION - DO NOT use a pipe or tubing cutter to cut <br />the upper drop tube, this may damage the tube, <br />causing It to be out of round thereby prohibiting <br />assembly of the unit <br />rig— <br />Figure 3B <br />71 SO -TOOL PROCEDURE BELOW <br />FOR 71 SO-TOOLC, SEE PAGE <br />FOR 71 SO-TOOLCT, SEE PAGE 10 <br />Nae: 71 SO -TOOL can only be used withtestable <br />overfill valves if modified as shown below. A 2" <br />wide slot must he added to accommodate cast lua. <br />IMPORTANT: Remove all chips and shavings generated <br />In steps 3 thru 5 out of the curt end ofthe tube. DO NOT <br />remove chips and shavings by dumping thru valve <br />body. <br />STEP 4: FILE THE UPPER DROP TUBE <br />File the upper tube square, and remove any buns or <br />rough edges. Make sure the cut is flat and square. <br />IMPORTANT. Carefully file a good chamfer on the In- <br />side edge of the drop tube to provide a lead -In for the <br />polypak seal and Inlet tube Installed In Step S. <br />Figure4 <br />STEP 5: SAND THE UPPER DROP TUBE <br />Sand the Inside ofthe drop tube with sandpaper and/or <br />steel wool to re move all burrs and sharp edges. After <br />sanding wipe down the Inside ofthe tube with a clean <br />rag from the top to approximately 4 Inches down to <br />remove any debris. <br />Caution: Failure to properly chamfer, sand, and <br />clean the drop tube may cut the seal and result in a <br />failure of a pressure decay leak test. <br />.*ear.dsere <br />Figure 5 <br />STEP 10A: TIGHTEN THE 71 SO -TOOL <br />Use the three view holes to ensure that the tool seats <br />out flat against the top of the inlet tube. To prevent <br />vertical movement of the tool during drilling, hand <br />tighten all three knobs evenly to the upper drop tube. <br />See Figure 10A. <br />Ir NPT <br />12'wlde <br />Confirm thatthe stop on the 3/16'drill bit supplied <br />Nipple <br />with the 71 SO -TOOL is In the correct position before <br />able valves <br />drilling. The stop 1,factory Installed atadistance be- <br />SNI <br />container <br />tween 2' to 2-1/16' from the tip with the 71 SO -TOOL. If <br />Jack Screw <br />Messunsbh <br />before drilling. <br />KA <br />for JatkSaew <br />blebbn <br />9 <br />O-Rng Seal <br />(TapdF.m <br />S*el Adaptor/ <br />—S-1 <br />7150 <br />Mads <br />Figure IA <br />3 <br />Figures <br />NOTE: Testable inlet tube must have cable port in <br />line with float. Testable inlet tube bottoms out on <br />stop, it does not bottom out on inlet flange. SeeFig- <br />e AA <br />• Cable port must be in <br />line with float <br />Figure 9A <br />Testable Models Only <br />SEE PAGE 8 FOR INSTRUCTIONS USING THE 71So- <br />TOOL. <br />SEE PAGE 9 FOR INSTRUCTIONS USING THE 71 SO- <br />TOOL4 <br />SEE PAGE 10 FOR INSTRUCTIONS USING THE 71SO- <br />ir � e <br />Nostable 7150 modeh ending with a -'require the <br />77SO-TOOLCT.,.aMred 7150 -TOOL ar ?ISO- TOOLC <br />Tape measure <br />Mark Upper Tube <br />(Cut Una) <br />Seam <br />Figure 2 <br />STEP 3: CUT THE UPPER DROP TUBE <br />Attach the supplied band clamp to the upper tube Just <br />below the mark and ensure that It Is assembled square <br />to the tube. The clamp can be used as a guide for mak- <br />ing a square cut. If a vise Is used, clamp on the valve <br />body casting only to avoid damage to the float and <br />tubes (See Figura 3A). Carefully saw through the tube <br />squarely, at the mark made In Step 2. Use a hacksaw <br />with a new fine-tooth blade. Rotating the upper tube <br />as the sawing progresses will minimize run out and en- <br />sure a square Wdegree cut Remove the band clamp <br />after tube Is cut. <br />CAUTION - DO NOT use a pipe or tubing cutter to cut <br />the upper drop tube, this may damage the tube, <br />causing It to be out of round thereby prohibiting <br />assembly of the unit <br />rig— <br />Figure 3B <br />71 SO -TOOL PROCEDURE BELOW <br />FOR 71 SO-TOOLC, SEE PAGE <br />FOR 71 SO-TOOLCT, SEE PAGE 10 <br />Nae: 71 SO -TOOL can only be used withtestable <br />overfill valves if modified as shown below. A 2" <br />wide slot must he added to accommodate cast lua. <br />IMPORTANT: Remove all chips and shavings generated <br />In steps 3 thru 5 out of the curt end ofthe tube. DO NOT <br />remove chips and shavings by dumping thru valve <br />body. <br />STEP 4: FILE THE UPPER DROP TUBE <br />File the upper tube square, and remove any buns or <br />rough edges. Make sure the cut is flat and square. <br />IMPORTANT. Carefully file a good chamfer on the In- <br />side edge of the drop tube to provide a lead -In for the <br />polypak seal and Inlet tube Installed In Step S. <br />Figure4 <br />STEP 5: SAND THE UPPER DROP TUBE <br />Sand the Inside ofthe drop tube with sandpaper and/or <br />steel wool to re move all burrs and sharp edges. After <br />sanding wipe down the Inside ofthe tube with a clean <br />rag from the top to approximately 4 Inches down to <br />remove any debris. <br />Caution: Failure to properly chamfer, sand, and <br />clean the drop tube may cut the seal and result in a <br />failure of a pressure decay leak test. <br />.*ear.dsere <br />Figure 5 <br />STEP 10A: TIGHTEN THE 71 SO -TOOL <br />Use the three view holes to ensure that the tool seats <br />out flat against the top of the inlet tube. To prevent <br />vertical movement of the tool during drilling, hand <br />tighten all three knobs evenly to the upper drop tube. <br />See Figure 10A. <br />STEP 9A: INSERT 71SO-TOOL OVER INLET TUBE <br />To Install the 7150 -TOOL (sold separately) over the Inlet <br />tube, first loosen all three knobs, so the tool can pass <br />Keely over the inlet tube flange. Align the slot on the <br />tool with the key on the Inlet tube and Insert the tool <br />down. See Figure 9A. <br />Todabl leo 41 Held <br />boas vlewholes tOh- <br />knobs <br />O <br />O <br />Ns <br />Tube <br />Iwy <br />Figure 9A Figure 1OA <br />CAUTION: If the drill stop Is not in the proper loca- <br />tion failure of a pressure decay leak test may result <br />71�4 <br />Tip to stop dimension must be <br />2'to 2-1/16'. <br />Figure 11A <br />STEP I2A: DRILLHOLES <br />With the inlet tube and 71 SO -TOOL in place, carefully <br />drilla 3/16" diameter hole In the upper tube using the <br />drill bushing In the knob as a guide. The drill stop Is po- <br />sitioned so it will bottom out against the knob after the <br />bit has drilled through the upper drop tube. If the stop <br />Is Positioned wrong either no hole will be drilled, or a <br />through hole could potentially be drilled through the <br />Inlet tube. If no hole Is drilled return to step I IA and <br />check the stop dimension. If a hole is drilled through <br />the Inlet tube or Into the screw hole the assembly Is not <br />salvageable. Drill (2) more holes In the two remaining <br />knobs. <br />O <br />Figur 124 <br />STEPPREPARE DRILL AND BIT <br />12'wlde <br />Confirm thatthe stop on the 3/16'drill bit supplied <br />to use with <br />with the 71 SO -TOOL is In the correct position before <br />able valves <br />drilling. The stop 1,factory Installed atadistance be- <br />tween 2' to 2-1/16' from the tip with the 71 SO -TOOL. If <br />the stop is not at the correct position it must be fixed <br />before drilling. <br />STEP 9A: INSERT 71SO-TOOL OVER INLET TUBE <br />To Install the 7150 -TOOL (sold separately) over the Inlet <br />tube, first loosen all three knobs, so the tool can pass <br />Keely over the inlet tube flange. Align the slot on the <br />tool with the key on the Inlet tube and Insert the tool <br />down. See Figure 9A. <br />Todabl leo 41 Held <br />boas vlewholes tOh- <br />knobs <br />O <br />O <br />Ns <br />Tube <br />Iwy <br />Figure 9A Figure 1OA <br />CAUTION: If the drill stop Is not in the proper loca- <br />tion failure of a pressure decay leak test may result <br />71�4 <br />Tip to stop dimension must be <br />2'to 2-1/16'. <br />Figure 11A <br />STEP I2A: DRILLHOLES <br />With the inlet tube and 71 SO -TOOL in place, carefully <br />drilla 3/16" diameter hole In the upper tube using the <br />drill bushing In the knob as a guide. The drill stop Is po- <br />sitioned so it will bottom out against the knob after the <br />bit has drilled through the upper drop tube. If the stop <br />Is Positioned wrong either no hole will be drilled, or a <br />through hole could potentially be drilled through the <br />Inlet tube. If no hole Is drilled return to step I IA and <br />check the stop dimension. If a hole is drilled through <br />the Inlet tube or Into the screw hole the assembly Is not <br />salvageable. Drill (2) more holes In the two remaining <br />knobs. <br />O <br />Figur 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.