Laserfiche WebLink
71SO-TOOLC PROCEDURE BELOW, <br />FOR71SO-TOOL, SEE PAGER <br />FOR 7150-TOOLCT, SEEPAGE 10 <br />Nota: 7150-TOOLC can only ba used wkh tastable <br />overfill valves N modified as shown below. <br />i <br />Add al 10-24 UNC thread or similar <br />to all three legs of the 71 S0. <br />TOOLC In the area shown. Use set <br />—1 to secure tool to upper <br />tube <br />71SO-TOOLC Modifications for Tastable Inlet <br />STEP 98: INSERT 71 SO-TOOLC OVER INLET TUBE <br />To Install the 71 SO-TOOLC (sold separately) over the <br />Inlet tube, first loosen the thumb screw, so the tool can <br />pass freely over the Inlet tube flange. Align the slot on <br />the tool with the key on the Inlet tube and Insert the <br />tool down. See Figure 98. <br />Tao S. <br />�a <br />omen <br />Mt�b <br />niet <br />Tube <br />xry <br />B,aa tgnter envmassnw <br />STEP IIB: PREPARE DRILL AND BIT <br />Confirm that the stop on the 3/16' drill bit supplied <br />with the 7150-TOOLC Is in the correct position before <br />drilling. The stop is factory installed at a distance be- <br />tween 1-3/16N to 1-1/4' from the tip with the 71 So- <br />TOOLC. If the stop Is not at the corma position it must <br />be fixed before drilling. <br />CAUTION: If the drill stop is not in the proper los a - <br />tion failure of a pressure decay leak test may result. <br />71 S0-T00LC <br />0 <br />Tip to stop dimension must <br />bel-3/16'to 1-1/4' <br />Figure 11 B <br />STEP 128: DRILLHOLES <br />With the Inlet tube and 7150-TOOLC In place, carefully <br />drill a 3/16" diameter hole In the upper tube using the <br />hole In the 71 SO-TOOLC as guide. The drill stop is po- <br />sitioned so It will bottom out against the tool after the <br />bit has drilled through the upper drop tube. If the stop <br />Is positioned wrong either no hole will be drilled, or a <br />through hole could potentially be drilled through the <br />Inlet tube. If no hole Is drilled return to step 118 and <br />check the stop dimension. If a hole Is drilled through <br />the inlet tube or Into the screw hole the assembly Is not <br />salvageable. Drill (2) more holes In the two remaining <br />guide holes. <br />r_j <br />STEP IOB: TIGHTEN THE 7150-TOOLC <br />Ensure that the tool seats flat against the top of the inlet <br />tube. To prevent vertical movement of the tool during <br />drilling, hand tighten the thumb screw against the up- <br />per drop tube. See Figure 106. <br />STEP 13: DIMPLE FIRST HOLE <br />Remove tool. Remove any chips or burrs from the drill - <br />Ing operation. Place the assembly on a solid surface. <br />Using the punch supplied with the 7150 -TOOL, 71 SO- <br />TOOLC, and 71 SO-TOOLCT, align the tip of the punch <br />with the drilled hole and dimple the upper drop tube by <br />striking the punch with a hammer until the drop tube Is <br />formed Into countersunk hole In the inlet tube. After <br />punching, remove any chips that may have fallen Into <br />the Inlet tube screw hole. <br />Figure 13 <br />STEP 14: ASSEMBLE FIRST SCREW <br />Ensure that the drop tube was formed Into the counter- <br />sunk screw hole as shown In Figure 141f not return to <br />Step 13. Apply black moly grease to screw and tighten <br />first screw Into inlet tube with a screwdriver. Use only <br />the taptlte screws that are supplied with the unit Smv <br />Ing torque Is 20 in -lbs min. to 35 in -lbs max. Sam head <br />should be flush with the drop tube. Do not over tight - <br />Figure 14 <br />Figure 128 <br />STEP 15: DIMPLE REMAINING HOLES <br />Remove any chips or burrs from the drilling operation. <br />Dimple the next (2) holes as done In Step 13. Make sure <br />the assembly is on a solid surface when punching. After <br />punching, remove any chips that may have fallen Into <br />the Inlet tube screw hole. <br />Align punch wish I -I <br />drilled hole <br />Figure IS <br />STEP 16: ASSEMBLE OTHER SCREWS <br />Apply black moly grease to screws and tighten the oth- <br />er (2) screws Into Inlet tube with a screwdriver as done <br />In Step 14. Use only the taptlte screws that are supplied <br />with the unit Seatingtorque is20Irimin. to35In- <br />lbs max. Do not over tighten. <br />STEP 17: APPLY GREASE TO LOWER O-RING AND <br />BODYTHREADS <br />Apply black moly grease to the lower tube o -ring and <br />body threads as shown. Make sure coverage is com- <br />pletely around the o -ring. Install o -ring In groovef ust <br />above threads. <br />Applygro ase <br />aroud -ring <br />0"ng - <br />9roow Body threads <br />Figure 17 <br />171SO-TOOLCT PROCEDURE BELOW, <br />FOR 71 SO -TOOL, SEEPAGE <br />e <br />FOR71SO-TOOLC, SEE PAGE <br />STEP 9C INSERT 71 SO-TOOLCT OVER INLET TUBE <br />To Install the 71 SO-TOOLCT (sold separately) over the <br />Inlet tube, first loosen the thumb screws, so the tool can <br />pass freely over the Inlet tube flange. Align the slot on <br />the tool with the key on the Inlet tube and Insert the <br />tool down. See Figure 9C. <br />Loosen <br />thumb Hand tighten <br />ot <br />screws Tool Slthumb screws <br />O o <br />r <br />Y <br />Inlet <br />Tube <br />I Key I <br />Figure 9C Figure 10C <br />STEP 1 OC: TIGHTEN THE 71 SO-TOOLCF <br />Ensure that the tool seats flat against the top of the Inlet <br />tube. To prevent vertical movement of the tool during <br />drilling, hand tighten the thumb screws against the up. <br />per drop tube. See Figure 1 OC. <br />STEP 11C PREPARE DRILL AND BIT <br />Confirm that the stop on the 3/16' drill bit supplied <br />with the 7150-TOOLCT is in the correct position before <br />drilling. The stop is factory Installed at a distance be- <br />tween 1-3/16'to 1-1/4' from the tip with the 71 SO- <br />TOOLCf. If the stop is not at the correct position it must <br />be fixed before drilling. <br />CAUTION: If the drill stop is not in the proper loca- <br />don failure of a pressure decay leak test may result <br />STEP 18: LOWER TUBE ASSEMBLY <br />If a vise Is used, clamp on the valve body casting only to <br />avoid damage to the float and tubes. Thread the lower <br />tube onto the valve body until the lower tube bottoms <br />out on valve body. Tube can be tightened by hand or <br />with a strap wrench. If a strap wrench Is used try ro po- <br />sitlon It on the threaded Insert portion of the lower tube <br />to prevent damaging the tube. <br />Threaded Insert <br />Figure 18 <br />NOTE: Before installing the valve in the tank a pres- <br />sure <br />can be performed on the valve to check for <br />vapor tightness. Seal off both ends of the tube with <br />inflatable plumber's plugs. Apply a maximu m 10" <br />W.C. (1 /3 PSI) air pressure. If pressure does not hold <br />and a leak can be located with soap solution, do not <br />install the valve. Send the valve back to OPW for <br />warranty evaluation. <br />CAUTION: Do not over -pressurize. Excess pressure <br />can damage the valve. <br />STEP 19: CUT LOWER TUBE <br />Measuring from the underside of the inlet tube flange, <br />mark the overall length of the drop tube a distance of <br />(B) minus 6". Determine dimension (B) from the meas- <br />urements taken in Step 1, Figure 1 (Top of the Face Seal <br />Adapter below the drain valve outlet in the spill con- <br />talnertothe bottom <br />of'he tari Saw off the excess <br />tube ata 45 -degree angle or per local codes or requlre- <br />menu and file off any sharp burrs (Refer to Figure 24). <br />Optional: Install the OPW Tank Bottom Protector on <br />the lower tube (Refer to Installation Instructions sup- <br />plied with the Tank Bottom Protector). <br />IMPORTANT: Remove all chips and shavings out of the <br />cut end of the tube. DO NOT remove chips and shave <br />Ings by dumping thru valve body. <br />7150-TOOLCT <br />Tip to stop dimension must <br />bei-3/16'to 1-1/4' <br />Figure 11C <br />STEP 12C: DRILL HOLES <br />With the Inlet tube and 71 SO-TOOLCT in place, carefully <br />drill a 3/16' diameter hole in the upper tube using the <br />hole In the 71 SO-TOOLCT as a guide. The drill stop Is <br />positioned so It will bottom out against the tool after <br />the bit has drilled through the upper drop tube. If the <br />stop Is positioned wrong either no hole will be drilled, <br />ora through hole could potentially be drilled through <br />the inlet tube. If no hole Is drilled return to step 11 C <br />and check the stop dimension. If a hole is drilled <br />through the inlet tube or Into the screw hole the assem- <br />bly Is not salvageable. Drill (2) more holes In the two <br />remaining guide holes. <br />omu,o,y,.eca' ��a,y <br />Figure 12C <br />FOR STANDARD VAPOR TIGHT MODELS, PROCEED <br />TO STEP 20 ON PAGE 14. <br />FOR TESTABLE MODELS, PROCEED TO PAGE 13. <br />