Laserfiche WebLink
f TAIL 1 - CHECKLIST OF REQUIREd TA <br /> -'FOR NO FURTHER ACTION REQUESTS AT UNDERGROUND TANK SITES <br /> Site Name and Location: Atchison,Topeka&Santa Fe RR Site,748 S Union Street, Stockton, San Joaquin Co..' <br /> Y 1.Distance to production wells for municipal, domestic, agriculture, industry No offsite beneficial use impacts, <br /> and other uses within,2000 feet of the site; according toISJC-EHD. <br /> U 2. Site maps, to scale, of area impacted showing locations of former and existing tank systems, Site maps,not to scale, .. , <br /> excavation contours and sample locations, boring and monitoring well elevation contours, which show general location <br /> gradients, and nearby surface waters, buildings, streets, and subsurface utilities; of soil borings and tank <br /> excavation boundary. <br /> 3.Figures depicting lithology(cross section), treatment system diagrams Boring logs included from the 22 July 1997; <br /> soil boring program. Little info.provided. <br /> 4. Stockpiled soil remaining on-site or off--site disposal(quantity); No indication of any overexcavation orso!l disposal. <br /> r: <br /> �5. Monitoring wells remaining on-site, fate, No monitoring wells were ever installed. <br /> 0 6. Tabulated results of all groundwater elevations and depths to water, N/A-no groundwaterinformation collected. , <br /> ; F <br /> Y 1 7.Tabulated results of all sampling and analyses: <br /> Sample information was provided from the laboratory,in tabula <br /> n Detection limits for confirmation sampling format, with detection limits. Not sampled for lead. <br /> nN Lead analyses <br /> 8. Concentration contours of contaminants found and those remaining in soil Soil contamination was encountered <br /> and groundwater, and both on-site and off-site: during the UST removal,hoever, follow-on <br /> Lateral andFYI Vertical extent of soil contamination work did not confirm the presence of any <br /> contamination.No mass left in place talc, <br /> Lateral and a Vertical extent of groundwater contamination or estimate of total release was completed. <br /> NA 9.Zane of influence calculated and assumptions used for subsurface <br /> remediation system and the zone of capture attained for the soil and <br /> groundwater remediation system; <br /> Q10.Reports/information ❑y unauthorized Release Form a QMRs <br /> El Welland boring logs Q PAR FRP a Other(report name)Limited Site Investigation Services <br /> ._ I .11.Best Available,Technology:(BAT)-Used.or an explanation for not using.BA.T;z remediation appears to have taken place <br /> -i <br /> x Low concentrations of T0Hd fi soil r" <br /> NA 12.Reasons why background wasris unattainable using BAT,- <br /> i <br /> 13,Mass balance calculation of substance treated versus that remaining; No Mass balance calculation was performed on, <br /> soil contamination left in place t <br /> NA 14.Assumptions,parameters, calculations and model used in risk <br /> assessments, and fate and transport modeling; <br /> 15.Rationale why conditions remaining at site will not adversely SJCEHD believes this is a LOW RISK,Soil Only Case �I <br /> impact water quality, health, or other beneficial uses;and <br /> NA 16.WET or TCLP results I` <br /> By: comments:Comments:Although the site characterization activities at the site were extremely limited, the low <br /> 4 <br /> concentrations of TPHd and other constituents in soil, at the time of the tank e'zcavation, do not pose a <br /> Dalte, significant threat to water quality. Benzene ND for all samples analyzed. This does apear to be a low risk <br /> $ 3 9$ soil only ease, with low concentrations of TPHd, toluene and xylenes, in the tank pit area. <br /> } <br /> i <br />