Laserfiche WebLink
STOCKTON CO-GEN FACILIOSITE INSPECTION 15 December 2000 <br /> w� I <br /> 1 ' <br /> YH <br /> O�I�� i4 <br /> i d <br /> n � <br /> 1 � <br /> II <br /> a: <br /> 4 5 6 <br /> f <br /> t" <br /> t� A' <br /> �A <br /> 7 R q <br /> 1. Reverse osmosis unit. <br /> 2. Cooling towers. <br /> 3. Top of"low-quality"water sump. This is the collection basin where water from boiler blow down, <br /> machinery drain, and auxiliary boiler blow down collects. This water is sent to cooling tower. <br /> 4. Belt skimmer within"low quality" sump. Was not operating at time of inspection. <br /> 5. Reclamation area where a small portion of the water is applied during summer months. <br /> 6. Outfall into North Littlejohns Creek. <br /> 7. Looking upstream(to east) along North Littlejohn Creek. <br /> 8. Looking downstream(to west) along North Littlejohns Creek. <br /> 9. Additional photo of outfall. <br />