Laserfiche WebLink
n <br /> Drill cuttings will be stored onsite in 55-gallon druins and/or placed on a soil <br /> remediation pile located on the property. <br /> TASK 2 WATER WELL SAMPLING <br /> The domestic groundwater supply well located in fhe shop yard will be sampled. The <br /> water well will be inspected to see if a sampling p rt is available. If a port is available <br /> the well will be run to obtain fresh water samples n the wellbore and a water grab <br /> sample obtained by a bailer. Depth of water, tim , and other pertinent data will be <br /> obtained to evaluate the water sample. If no port is available, a grab sample will be <br /> obtained by running the well for a period of timet at will clear approximately 3 to 5 well <br /> volumes. A water sample will be obtained from t e well and placed in an appropriate <br /> water sampling container. The water sample will a collected in a 40 ml VOA container <br /> and in 1 1 amber glass containers. The water sample will be analyzed by USEPA Test <br /> Method 8015 (modified) for total petroleum hydrocarbon as gasoline and diesel fuel <br /> and USEPA Test Method 602 for benzene, toluene, ethylbenzene, and xylene. In <br /> addition, methyl tertiary butyl ether (MTBE) will be evaluated by USEPA Test Method <br /> 602 and if deemed necessary by USEPA Test Method 8260. <br /> TASK 3: LABORATORY ANALYSIS <br /> Soil samples will be analyzed for total petroleum hydrocarbons as both gasoline and <br /> diesel fuel by USEPA Test Method 8015 (modified). Soil samples will be analyzed for <br /> benzene, toluene, ethylbenzne, and xylene by US EPA Test Method 8020. All samples <br /> will be inventoried on a chain of custody docurner t and transported to a California Sate <br /> certified analytical laboratory. <br /> 5 <br />