My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008386
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VINE
>
1500
>
2900 - Site Mitigation Program
>
PR0506306
>
ARCHIVED REPORTS_XR0008386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:09:55 PM
Creation date
6/1/2020 12:05:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008386
RECORD_ID
PR0506306
PE
2951
FACILITY_ID
FA0007337
FACILITY_NAME
HI HOPES VENTURE*
STREET_NUMBER
1500
Direction
E
STREET_NAME
VINE
STREET_TYPE
ST
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
1500 E VINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z1 INC <br /> APPENDIX III <br /> EXPLORATORY EXCAVATION AND SOIL BORING SAMPLING PROTOCOL <br /> 1.0 EXPLORATORY EXCAVATION PROCEDURES <br /> The lateral and vertical extent of soil hydrocarbon contamination at the subject property <br /> will be determined by surface excavation procedure to attempt clean closure The area <br /> to be excavated will be immediately around the location of the existing above ground <br /> storage tank The excavation plan will provide for a pit extending vertically downward from <br /> the area of maximum surface contamination Equipment will be able to excavate material <br /> to a maximum depth of approximately 30 feet, if necessary <br /> A California State Certified Engineering Geologist will supervise excavating operations <br /> • He will review and supervise the separating and stockpiling of the clean and contaminated <br /> soil, make onsite changes in excavation geometry, and record encountered geologic and <br /> hydrocarbon contamination conditions as observed in the field Excavation of <br /> contaminated soil will continue until soil that is believed to be uncontaminated is reached <br /> both vertically and laterally along the sides and bottom of the pit Soil samples will be <br /> obtained along the walls and floor of the excavation laterally every 50 feet or as <br /> appropriate and will be analyzed for specific constituents as outlined In the workplan The <br /> excavation process will continue until non-detect soil contamination levels are reached for <br /> all walls and floors of the pit Appropriate fencing material will be placed around the <br /> excavation to prevent unauthorized entry After regulatory approval the excavation will be <br /> backfilled <br /> • <br /> APPENDIX III <br /> 08220010 011 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.