My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:40:03 PM
Creation date
6/1/2020 12:21:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Backfill with materials equal to or <br /> better than the existing pavement <br /> and base in quality. New pavement <br /> shall be 1" thicker than existing <br /> pavement, minimum of 0.25 feet. <br /> New base shall be 1 " thicker than <br /> existing base, minimum of 0.5 feet. <br /> Existing <br /> Pavement <br /> 6" Min. 6" 6' 6" Min. <br /> (TYp ) (TYp•) <br /> Compact in 12" max. <br /> 3'—o" layers to a min. relative <br /> \ compaction of 95%* <br /> under pavement and _____--___ <br /> ---------- 90% outside pavement. --- Variable <br /> Variable \ Compact in 24" max. <br /> — — layers to a min. relative <br /> — compaction of 85%. �. ' OD+12" <br /> O.D./2 Compact ,in 6" layers <br /> to a minimum relative <br /> �\ \ compaction of 90%. <br /> .10 Min. O.D. 10" Min. 10" Min. 0.D. 10" Min. <br /> 0.D. 0.D. <br /> + 20" Min. + 20" Min. <br /> RIGID CONDUIT FLEXIBLE CONDUIT <br /> NOTES: <br /> 1. Relative compaction of materials shall be tested in accordance with <br /> the State of California, Dept. of Transportation Testing Manuals, test <br /> method No. California 216 or 231 . <br /> 2. All existing pavement shall be neatly cut to line prior to trench excavation. <br /> 3. Jetting or ponding will be permitted within the street Right of Way with <br /> a 3 year bond. <br /> 4. When shown by soil composition and compactability, ninety percent (90%) <br /> compaction may be used, when approved by the Director of Public Works. <br /> 5. Special bedding requirements may be shown on the, plans or specified in <br /> special provisions. <br /> 6. Shoulders shall be as shown on the plans or specified in the special <br /> provisions but in no case shall the shoulder be less than three feet wide <br /> as measured from the edge of pavement. <br /> No: 'Revised. BY <br /> Approved by <br /> 1 Feb. 1996 Po TYPICAL TRENCH BACKFILL <br /> Direct of Public Works. <br /> Drew^ by J LD <br /> Ch¢ vd by COUNTY OF SAN JOAQUIN Date JUNE 1997 <br /> Syme NONE 017AMID9 or Pueuc WOM Drawing No. R-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.