Laserfiche WebLink
Mike Infurna [EH] <br /> From: Wilfrido Paniagua [PHS] on behalf of Network Administrator [PHS] <br /> Sent: Thursday, May 17, 2007 1:36 PM <br /> To: Mike Infurna [EH] <br /> Subject: FW: minfurna@sjcehd.com - Bayesian Filter detected spam - Musco Family Olive Co. Well <br /> Schematics <br /> Attachments: Document.pdf <br /> Document.pdf(96 <br /> KB) <br /> ATTENTION: This message has been forwarded by the Network Administrator because it was <br /> accidentally caught in the spam filter. It will be reviewed and the system will be re- <br /> tuned in an attempt to prevent future recurrences. Please direct any replies to the <br /> original sender. <br /> Thank you, <br /> The Network Administrator <br /> -----Original Message----- <br /> From: Kelly Hegman [mailto:KellyH@olives.com] <br /> Sent: Thursday, May 17, 2007 10:43 AM <br /> To: Mike Infurna [EH] <br /> Subject: minfurna@sjcehd.com - Bayesian Filter detected spam - Musco Family Olive Co. Well <br /> Schematics <br /> Good morning Mike, <br /> Attatched are the well schematics for the three completed wells during your absence. <br /> For MW23 I have yet to measure the total casing because it is capped off at ground <br /> surface, and a the monument has yet to be installed as it's location interferes with the <br /> current installation of the well we are drilling beside it. <br /> The total casing for MW-6R is approximately 991 , since we installed a flush mount, but I <br /> haven't yet gotten an exact measurement. <br /> I would like to apologize for the miscommunication. I understand that you spoke with <br /> Kennedy/Jenks and was not happy. I was under the impression based on the email <br /> conversation below that you would be out here either yesterday or today and collect the <br /> well schematics from me in person. <br /> >>> "Mike Infurna [EH] " <MInfurna@sjcehd.com> 5/9/2007 3 :58 PM >>> <br /> IF ok with Todd, OK with me. <br /> Have your field tech (Kelly?) complete an "as-built" for this new well that shows depths, <br /> materials (and amounts of sand and bent) , size of bent and amount, and any spec info, like <br /> surge block method and time and any sand drop. I've spoken with Kelly about this for the <br /> other three wells already approved and he knows to keep the "as-builts" until I'm out <br /> there again around May 16 or 17th. <br /> As for our current status, when drilling MW-23 (the additional well located next to <br /> MW-14) , we encountered a shallow groundwater zone at - 15 ' bgs. The decision was made <br /> during the drilling to install a steel conductor to seal off this groundwater zone. We <br /> were expecting to reach a deep aquifer near 100' ft depth, but to our surprise, found an <br /> 1 <br />