My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eooft3j 19966 ON YH/X,L1 MOT Q*ooZ/U/co • <br /> Benjamin Hall <br /> Musco Family Olive Company - 2 — <br /> San <br /> 2 — <br /> San Joaquin County <br /> from ASTM, 100 Barr Flarbw°Drive, West Conshohocken, PA 19428-2959J. <br /> (B) Rock shall be described in the geologic log in a manner appropriate for the purpose of the <br /> investigation. <br /> (C) Where possible, the dept} and thickness of saturated zones shall be recorded in the geologic <br /> log." <br /> Please include a statement in a subsequent work plan that addresses this requirement. <br /> 4. On page 4, the work plan addresses the complexity of the.site while referencing cross-sections of <br /> the groundwater Monitoring wells relative to the surface impoundments- The crsections Were <br /> included in the work plan. <br /> Please include cross-sections in a subsequent work plan. <br /> 5. On page g, the work plain recommends moniwring parameters for the first sampling event. <br /> WDRs R5-2005-6024 includes the minimum sampling parameters in the monitoring and reporting <br /> program. One constituent that was left off from your list was sodium. <br /> Please revise this page to include sodium.in the list of monitoring parameters to be consistent with <br /> WDRs. <br /> According to the schedule on page 10, the wells will be installed in April 2005. Please submit a revised <br /> work plan by 1 April 2005 for acceptance by the Regional Board prior to drilling. If you have any <br /> questions, please contact me at 916-464-4737. <br /> QFVU� (�r <br /> KIM A- SCHWAI3, P.G. <br /> Engineering Geologist <br /> cc: Robert McClellon, San Joaquin County Environmental Health Department, Stockton. <br /> San Joaquin County Planning Department, Stockton <br /> Amy Simpson, RWQCB-CV, Fresno Office <br /> Paula Hansen, Kennedy/Jenks Consultants, San Francisco <br /> £O d <br /> anLLO KL oosnW ySb = Oi 50-£Z-�pW <br />
The URL can be used to link to this page
Your browser does not support the video tag.