My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board a ' <br /> Central Valley Region <br /> Robert Schneider,Chair Gray Davis <br /> Winston H.Hickox <br /> Secretaryfor Sacramento Main Office Governor <br /> Environmental Internet Address: bttp://www.swrcb.ca.gov/—rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> ORDER NO. 115-2002-0148 <br /> ATTACHMENT D <br /> ITEMS TO BE INCLUDED IN A MONITORING WELL/LYSIMETER INSTALLATION <br /> WORKPLAN AND INSTALLATION REPORT OF RESULTS <br /> Prior to installation of groundwater monitoring wells or lysimeters, the Discharger shall submit a <br /> workplan containing the minimum listed information. Monitoring devices may be installed after staff <br /> approve the workplan. Upon installation of the monitoring devices, the Discharger shall submit a report <br /> of results, as described below. All workplans and reports must be signed by a registered geologist, <br /> certified engineering geologist, or civil engineer registered or certified by the State of California. <br /> Monitoring Well/Pan Lysimeter Installation Workplan <br /> A. General Information: <br /> Monitoring device locations and rationale <br /> Survey details <br /> Equipment decontamination procedures <br /> Health and safety plan <br /> Topographic map showing any existing monitoring wells,proposed wells, waste handling <br /> facilities, utilities, and other major physical and man-made features. <br /> B. Drilling Details: describe drilling and logging methods <br /> C. Monitoring Well/Pan Lysimeter Design: <br /> Monitoring Wells <br /> Casing diameter <br /> Borehole diameter <br /> Depth of surface seal <br /> Well construction materials <br /> Diagram of well construction <br /> Type of well cap <br /> Size of perforations and rationale <br /> Grain size of sand pack and rationale <br /> Thickness and position of bentonite seal and sand pack <br /> Depth of well, length and position of perforated interval <br /> Pan Lysimeters <br /> Excavation technique <br /> Lysimeter construction materials <br /> Backfill materials <br /> Target vertical permeability value <br /> California Environmental Protection Agency <br /> ped Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our Web-site at hup://www.swrcb.ca.gov/mgcb5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.