Laserfiche WebLink
Monitoring Well/Lysimeter Installation Workplan - 2 - <br /> Monitoring <br /> Z _Monitoring Well/Lysimeter Installation Report <br /> D. Well Development: <br /> Method of development to be used <br /> Method of determining when development is complete <br /> Method of development water disposal <br /> E. Surveying Details: discuss how each monitoring device will be surveyed to a common reference <br /> point horizontal and vertical survey data is required. <br /> F. Soil Sampling(if applicable): <br /> Cuttings disposal method <br /> Analyses to be run and methods <br /> Sample collection and preservation method <br /> Intervals at which soil samples are to be collected <br /> Number of soil samples to be analyzed and rationale <br /> Location of soil samples and rationale <br /> QA/QC procedures <br /> G. Sampling: <br /> Monitoring Well <br /> Minimum time after development before sampling(48 hours) <br /> Well purging method and amount of purge water <br /> Sample collection and preservation method <br /> Table describing sample volumes, sample containers,preservation agents, and hold times <br /> QA/QC procedures <br /> Pan Lysimeter <br /> Sample collection and preservation method <br /> Table describing sample volumes, sample containers,preservation agents, and hold times <br /> QA/QC procedures <br /> Post sample collection purge of lysimeter <br /> H. Water Level Measurement: <br /> The elevation reference point at each monitoring well shall be within 0.01 foot. Ground <br /> surface elevation at each monitoring well shall be within 0.1 foot. Method and time of water <br /> level measurement shall be specified. <br /> I. Proposed time schedule for work. <br /> Monitoring Well/Pan Lysimeter Installation Report of Results <br /> A. Well Construction: <br /> Number and depth of wells drilled <br /> Date(s)wells drilled <br /> Description of drilling and construction <br /> Approximate locations relative to facility site(s) <br /> A well construction diagram for each well must be included in the report, and should contain <br /> the following details: <br /> V�Sm Iwquw NmI5�5 WMbnmTMu�Wich p wail Iysm.Cx <br />