Monitoring Well/Lysimeter Installation Workplan - 3 - <br /> Monitoring <br /> 3 - <br /> Monitoring Well/Lysimeter Installation Report <br /> Total depth drilled <br /> Depth of open hole (same as total depth drilled if no caving occurs) <br /> Footage of hole collapsed <br /> Length of slotted casing installed <br /> Depth of bottom of casing <br /> Depth to top of sand pack <br /> Thickness of sand pack <br /> Depth to top of bentonite seal <br /> Thickness of bentonite seal <br /> Thickness of concrete grout <br /> Boring diameter <br /> Casing diameter <br /> Casing material <br /> Size of perforations <br /> Number of bags of sand <br /> Well elevation at top of casing <br /> Depth to ground water <br /> Date of water level measurement <br /> Monitoring well number <br /> Date drilled <br /> Location <br /> B. Pan Lysimeter <br /> Date(s) lysimeters constructed <br /> Description of construction <br /> Approximate locations relative to facility site(s) <br /> A construction diagram for each lysimeter must be included in the report <br /> C. Well Surveying: provide reference elevations for each well and surveyor's notes <br /> D. Percolate Sampling: <br /> Date(s) of sampling <br /> How lysimeter was purged <br /> Levels of temperature, EC, and pH at stabilization <br /> Sample collection,handling, and preservation methods <br /> Sample identification <br /> Analytical methods used <br /> Laboratory analytical data sheets <br /> Purging of residual lysimeter water <br /> F. Soil Sampling (if applicable): <br /> Date(s)of sampling <br /> Sample collection,handling, and preservation method <br /> Sample identification <br /> Analytical methods used <br /> Laboratory analytical data sheets <br /> v:%m)o.a=in NwIS�umo�rn�V=, =e D 1irim.e <br />