My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:35:35 PM
Creation date
6/1/2020 12:29:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Colnaultw is <br /> Analytical data received from the laboratory will be reviewed immediately upon receipt for <br /> completeness and consistency. Any discrepancies will be discussed with the laboratory and <br /> corrective measures, such as reanalysis or resampling, will be implemented if warranted. <br /> 2.7 Report Preparation and Submittal <br /> The groundwater well installation and sampling activities will be described in a technical report <br /> that will be submitted to the RWQCB no later than 30 April 2011. The well installation <br /> information will be included with descriptions of other investigations performed to evaluate <br /> sources of, and responses to, nitrogen in onsite groundwater. The technical report will include <br /> the following information regarding the monitoring wells: <br /> • Brief description of geologic/hydrogeologic conditions encountered during installation of <br /> the additional groundwater monitoring wells. <br /> • Updated site map showing facilities, well locations, and other major physical and man- <br /> made features. <br /> • Drilling details, including soil boring logs, a narrative description of field activities; well <br /> construction details; well development information; and a well survey. <br /> • Tabulated summaries of the groundwater monitoring data. <br /> • Laboratory analytical data reports and chain-of-custody forms. <br /> The Report will be signed and stamped by a California Professional Engineer or Geologist. <br /> 2.8 Anticipated Schedule <br /> The monitoring wells will be installed and developed following receipt of approval from the <br /> RWQCB on this Work Plan. Drilling permits will be submitted to the San Joaquin County <br /> Environmental Health Department, as soon as the RWQCB provides approval of this Work Plan. <br /> Drilling is currently scheduled to begin on 1 June 201 sco would like to complete <br /> installation of the two additional wells, with int is groundwater samples collected, by <br /> 15 June 2010. <br /> The newly installed wells will be incorporated into Musco's ongoing quarterly groundwater <br /> monitoring and reporting program for at least one year. Depending upon the incremental value <br /> of the water quality data provided by these monitoring wells, it is possible that one or both wells <br /> will be properly abandoned after four quarterly monitoring events. <br /> Preliminary Work Plan for Evaluation of Nitrogen in Groundwater Page 7 <br /> Musco Family Olive Company, Tracy, California <br /> g:gegmgledminUbbTM201060o_mu=ofveTg epo Wtogen x pWWAt <br />
The URL can be used to link to this page
Your browser does not support the video tag.