Laserfiche WebLink
Contaminants remaining at the conclusion of the excavation attempt, in addition <br /> to the above mentioned concerns, shall be addressed in.the Soils Remediation <br /> Plan. The Soils Remediation Plan should include a feasibility study for each <br /> option proposed. This report should be submitted to Public health Services, <br /> Environmental Health Division and RWQCB for review no later than March 2, 1990. 1 <br /> Should you have any questions regarding this matter contact Greg Lyon, EHS, of <br /> my staff at (209) 468-34.42. <br /> i <br /> Jogi Khanna, M.D., MPH <br /> Health Officer <br /> Ron Valinoti Director <br /> Environmental Health Division <br /> RV/GL:nr <br /> cc: RWQCB - G.L. Boggs <br /> Seibold Corp. <br /> 820 S. American St. <br /> Stockton, CA 95206 <br /> Attn: Mr. Brad Frahm <br /> Weston Consultants <br /> 83 W. March Lane, STE. 12 <br /> Stockton, CA 95207 <br /> Attn: Erik A. Friedrich <br />