Laserfiche WebLink
Invitation For Bid: Hartmann and Setness <br /> Site Addresses: <br /> Former Chase Chevrolet Facilities(separate Sites): <br /> • 423 N. Madison 424 N. Van Buren <br /> Stockton,California Stockton,California <br /> Page 18 <br /> Narratives must also consider subcontractor invoices with respect to budget position and <br /> reasonableness of accumulated charges for services rendered. <br /> Cost estimates must be submitted in spreadsheet form with your bid. Estimates must also <br /> contain unit cost estimates for all types of invasive penetrations specified in your <br /> proposal. Wherever possible, an effort should be made to provide unit cost rates for labor <br /> and materials such that should additional work be required, these extensions can be dealt <br /> with on unit cost rates which is acceptable to the USTCF. An electronically readable <br /> spreadsheet is not necessary as a part of your submittal package, but may be required <br /> upon project award. For purposes of clarity, your cost estimates should be arranged <br /> according to work stages as described in a previous section. <br /> Costs for proposal preparation are not reimbursable as a consequence of this bid <br /> specification. Contract award will be to the lowest bidder that satisfies the extensive <br /> technical requirements stipulated in this bid specification. Your bids will be reviewed for <br /> technical content first to determine bid responsiveness. Bids deemed unresponsive will <br /> be rejected without appeal. Bids considered technically competent and responsive to the <br /> bid specification herein will then be reviewed for cost competitiveness. Contract award <br /> may be preceded by a technical/fiscal interview. <br /> • <br />