My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN BUREN
>
424
>
3500 - Local Oversight Program
>
PR0545786
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 1:56:21 PM
Creation date
6/1/2020 1:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545786
PE
3526
FACILITY_ID
FA0004969
FACILITY_NAME
CHASE CHEVROLET
STREET_NUMBER
424
Direction
N
STREET_NAME
VAN BUREN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
424 N VAN BUREN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.7 Groundwater Extraction,Treatment and Disposal <br /> Approximately 40,000 gallons of groundwater were pumped from the excavation and stored in <br /> 20,000 gallons Baker Tanks prior to analysis. The analytical results indicated that the <br /> groundwater exceeded the discharge requirements of the City of Stockton Municipal Utilities <br /> Department(SMUD). Therefore,the groundwater was filtered through carbon vessels and <br /> re-sampled. Results of the second groundwater analyses met the SMUD requirements. <br /> Laboratory analytical reports for the groundwater samples are included in Appendix B. SMUD <br /> accepted the groundwater for discharge in a 25 May 2004 permit that is included in Appendix D. <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS <br /> Site remediation, confirmation,and soil disposal activities were conducted at the site between 24 <br /> April and 11 May 2004 according to the 2004 Workplan. After remedial work was completed, <br /> the excavation was backfilled to previous grade. <br /> All of the soil excavated from 10 to approximately 22-foot bgs(5-feet below the groundwater <br /> table) contained significant TPHg concentrations. The excavation soil sample(16-exc-23) <br /> collected at 23 feet bgs contained significant TPHg concentrations, but previous sampling at <br /> 24.5 feet bgs in 16B-6b,located adjacent to 16-EXC-23,did not contain TPHg. On the basis of <br /> this data, it appears that the majority of the contaminated soil from below the former UST has <br /> been removed. <br /> Approximately 40,000 gallons of contaminated groundwater was removed from the excavation. <br /> Analytical results from the confirmation groundwater sample indicate that the most contaminated <br /> groundwater at the site has been removed. Since groundwater analyses began at monitoring well <br /> MW-3 installed in the excavation area in 1996,concentrations of TPHg have not shown a <br /> significant change,averaging approximately 180,000µg/L;in spite of several years of various <br /> in-situ remediation technologies (air sparging,vapor extraction, and ozone sparging).being <br /> operating at the Site. The TPHg concentration in the excavation groundwater sample was 4 to 5 <br /> times lower(43,000 gg/L)than in recent samples from borings 16B-6 and 16B-8, located in the <br /> 25971021.DJS 8 18 November 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.