Laserfiche WebLink
Table 1 <br /> Summary of Well Destruction <br /> Methods <br /> Banner Island Project,Stockton,California <br /> Well Destruction Methodltl Casing Casiag <br /> Well Identification Drill Out Pressure Diameter Depth Type of Well <br /> Well Grout Well (taches) (feet) <br /> Area 21 <br /> MW-I 1 W23moniiorinz itorin <br /> MW-2 1 itorin <br /> MW-3 1 itorin <br /> MW-4 1 itorin <br /> MW-5 1 itorin <br /> MW-6 I itorin <br /> MW-7 1 itorin <br /> MW-8 I itorin <br /> VERT-I 1 4 15 Vapor <br /> VEW'2 1 2 13 Varior <br /> VEW-3 1 2 13 Vapor <br /> ASI 1 2 30 AirSparge <br /> AS2 l 230 Air S at <br /> e <br /> AS3 1 2 30 Air Sparge <br /> e <br /> SP-1,2,4,5,7&8 6 2 30 Ozone <br /> SP-3,6,9&10 4 2 30 Ozone <br /> Area 10 MonitoringWells All wells Pressure routed at this site) <br /> MWA 1 4 37 Monitorin <br /> MW-2 1 2 40 Monitorin <br /> MW-3 I 4 38 Monitorin <br /> MW-4 1 4 40 Monitorin <br /> ori <br /> MW-5 1 4 40 Monitn <br /> MW-6 1 4 40 Monitoring <br /> MW-7 1 4 40 Monitoring <br /> MW-8 1 4 40 Monitoring <br /> MW-9 I 4 40 Monitoring <br /> Area 20 MonitoringWells <br /> MIN-1 1 4 40 Monitoring <br /> MW-2141 1 4 40 Monitoring <br /> MW-3 1 4 40 Monitoring <br /> Total Wells 79 32 <br /> (11 Well destruction occurred between 1 and 16 March 2004 <br /> (2)SICERD personnel approved pressure grouting of wells SW-1 through SW-4 because of their <br /> proximity to overhead electrical lines <br /> P)SW-10 has not yet been located or destroyed <br /> 19/Also designated as SMW-2 <br /> Page 2 of 2 <br /> Well Destruction/APPROVED WELL ABANDONMENT 3/21/2007 10:59 AM <br />