Laserfiche WebLink
1 <br />' 19 November 1997 <br /> AGE-NC Project No 95-0143 <br />' Page 4 of 4 <br />' Continued quarterly monitoring of the monitoring well system on the site The next quarterly <br /> monitoring will be scheduled for February 1998, concurrent with monitoring at the Madison <br /> site <br />' <br /> 60. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing In this or similar localities The findings were based mainly <br />' upon analytical results provided by an independent laboratory Evaluations of the geologic <br /> conditions at the site have been made from a limited number of available data points (I a ground <br /> water momtoring well samples and ground water measurements), and subsurface conditions may <br />' vary through time and with distance from these data points No other warranty,expressed or implied, <br /> is made as to the professional recommendations contained in this report <br /> t <br /> I <br /> • <br /> Advanced CeoEnvironmental,Inc <br />