My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008888
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN BUREN
>
424
>
3500 - Local Oversight Program
>
PR0545786
>
ARCHIVED REPORTS_XR0008888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 2:37:03 PM
Creation date
6/1/2020 2:09:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008888
RECORD_ID
PR0545786
PE
3526
FACILITY_ID
FA0004969
FACILITY_NAME
CHASE CHEVROLET
STREET_NUMBER
424
Direction
N
STREET_NAME
VAN BUREN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
424 N VAN BUREN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 10 December 2001 <br /> ro <br /> AGE NC Project No 95-0143 <br />' 3 <br /> Page 2 of 10 <br />' From September to November 1995, five additional monitoring wells (MW-10, MW-14, MW-15, <br /> MW-16 and MW-17)were installed on and near the site Petroleum hydrocarbons were not detected <br /> in any of the soil samples analyzed Procedures and findings were summarized in the Quarterly <br />' Report - December 1995, dated 29 January 1996, prepared by AGE <br /> In April 1999, 11 horizontal vapor recovery wells, 5 vertical vapor extraction wells and 23 air <br />' sparging wells were installed at the site A thermal/catalytic oxidizer soil vapor extraction(S VE) unit <br /> and an in-situ air sparging (IAS) unit were subsequently installed north of the car wash canopy <br /> Details of the SVE/IAS system installation were reported in Quarterly Report-May 1999, dated 30 <br />' July 1999 and Quarterly Report - August 1999, dated 05 October 1999, both prepared by AGE <br /> Operation of the SVE/IAS system was initiated in November 1999 and continued until November <br /> 2000 The SVE system was shut down due to a significant decrease in hydrocarbon concentrations <br />' in soil gas drawn from the vadose zone The decrease in hydrocarbon concentrations coincided with <br /> an increase in ground water elevation that may have "drowned"the portion of vadose zone in which <br />' the extraction wells were screened Approximately 830 gallons of petroleum hydrocarbons were <br /> extracted during operation of the SVE system <br />� . On 15 and 16 March 2001, five soil borings (MW-22, MW-23, MW-24, EW-3 and EW-4) were <br /> advanced at the site Borings MW-22, MW-23 and MW-24 were completed as 2-inch ground water <br /> monitoring wells,borings EW-3 and EW-4 were completed as 4-inch ground water extraction wells <br />' Extraction wells EW-3 and EW-4 were installed to address hydrocarbon-impacted ground water at <br /> the site and to induce draw-down in local ground water Draw-down of local ground water would <br /> increase vadose zone and enhance SVE performance at the former UST pit location Procedures and <br /> t results of the well installation were sumrnanzed in AGE's Quarterly Report -- First Quarter 2001, <br /> dated 30 May 2001 <br />' 3.0. GROUND WATER AQUIFER PUMPING TESTS <br /> 1 An 8-hour step draw-down aquifer pumping test and a 24-hour constant rate aquifer pumping test <br /> were performed at the site on 30 May 2001 and 17--15 July 2001, respectively Wells screened in the <br /> upper water zone (EW-3, EW-4, MW-3, MW-7, MW-9, VW-1, VW-2 and VW-4)were utilized as <br />' observation wells during both tests Table 1 summarizes well construction specifications Based on <br /> previous subsurface investigations, AGE informally identified the upper water zone as being a <br /> significant interval of porous, coarser-grained sand and silty sand separated from lower water zones <br />' by less permeable silty clay/clayey silt and silt layers The bulk of the impacted water is believed to <br /> be within the sandy unit Generally, the upper water zone was identified at depths between 15 feet <br />' (first encountered ground water) and 35 feet bsg <br /> • <br />' Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.