Laserfiche WebLink
1 <br /> i 30 May 2001 <br />' AGE-NC Project No 95-0143 <br /> Page 8 of 8 <br />' a Continued quarterly monitoring of the ground water monitoring well system on the site The <br /> next quarterly monitoring should be performed in May 2001, concurrent with monitoring at <br /> the Madison site <br />' 9 Completion of the scope of work proposed in AGE s Remedial Action ffork Plan.4ddendum <br /> -November 2000, dated 27 November 2000 Tasks to be completed include an 8-hour step <br />' drawdown pump test and a 24-Hour aquifer constant rate pump test <br /> • Limiting ground water analysis to TPH-g and BTEX Fuel additives (RIPE and TBA) have <br />' been detected only sporadically at low concentrations (less than 7 µg/1) since monitoring <br /> began in 1997 <br />' 6.0 LIMITATIONS <br /> I Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the soil and ground <br />' water conditions at the site have been made from a limited number of available data points (i e <br /> ground water samples and measurements, soil samples and SVE system monitoring points), and <br /> subsurface conditions may vary through tune and with distance from these data points No other <br /> warranty, expressed or implied, is made as to the professional recommendations contained in this <br /> report <br /> I <br /> I <br /> I <br /> Advanced GcuEnvironmental,Inc <br />