Laserfiche WebLink
.. <br /> � ^ <br /> . . <br /> CONDITIONS OF APPROVAL <br /> SA-89-30 <br /> PAGE TWO <br /> 5) All compaction reports must be submitted prior to <br /> issuance of a building permit. <br /> 6) All grading permits are subject to approval by the <br /> other departments. <br /> 3, LOCAL BCALI8 DISTRICT <br /> u. The walnut hulls and waste material generated from this <br /> operation must be handled so they do not create an odor <br /> or vector problem. <br /> 4. REGIONAL WATER QUALITY CONTROL BOARD , <br /> u. The applicant shall secure the approval of the Board. <br /> 5. AIR POLLUTION CONTROL DISTRICT <br /> u. The applicant shall secure on Authority to Construct <br /> and Permit to Operate from the District. <br /> b. Dust generated from the huller shall not exceed 20% <br /> opacity. <br /> 6. SUDIB SAN J0AODIN COUNTY IRRIGATION DISTRICT <br /> u. The applicant shall submit additional details regarding <br /> the operation of the huller to the District. <br /> b. A standard Encroachment Agreement shall he entered into <br /> with the District. <br /> NOTE: A copy of the letter from the District in response <br /> to this application is enclosed for your <br /> information. <br /> 7. PLANNING DIVISION <br /> u. All truck and automobile driveway, parking and <br /> maneuvering areas shall be cbipoealed over compacted <br /> native soil, and shown on the Improvement Plan. <br /> b. Truck circulation details and u minimum of one (l) <br /> employee parking space shall be shown on the <br /> Improvement Plan. <br /> C. The Improvement Plan shall include a note regarding the <br /> ultimate destination and use of water used as u part of <br /> the operation. Also include a note listing any <br /> chemicals used as u part of this operation. <br />