My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004158
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
15322
>
2600 - Land Use Program
>
GX-92-03
>
SU0004158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:42 PM
Creation date
6/2/2020 2:46:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004158
FACILITY_NAME
GX-92-03
STREET_NUMBER
15322
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
15322 E HWY 120
RECEIVED_DATE
4/9/1992 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOUTH SAN JOAQUIN IRRIGATION DISTRICT <br /> 11011 East Highway 120 a Manteca, CA 95336 <br /> (209) 823-3101 • FAX (209) 823-8406 <br /> San Joaquin County Planning Department <br /> 1810 East Hazelton Avenue <br /> Stockton , CA 95204 <br /> ATTENTION: Bill DuBois <br /> SUBJECT: rX-92-3 - A. & J . Boersma - A.P.N. Z45-040-ZB <br /> May 12 , 1992 <br /> Dear Mr. DuBois : <br /> The excavation plan submitted for the subject property has been <br /> reviewed as it relates to the operation and maintenance of <br /> District facilities within the proposed excavation area. <br /> There are typically several items of concern to the District when <br /> excavations of this nature take place near District facilities . <br /> In an effort to help address some of these concerns , it is <br /> requested that , as condition of approval , the applicant be <br /> required to submit the excavation plan, showing all District <br /> easements , to the south San Joaquin Irrigation District' s Board <br /> of Directors for their approval and signature,. <br /> Furthermore , in order to comply with certain requirements which <br /> have generally been conzidered acceptable standards with regard <br /> to excavation* , it is regilested that the following notes be added <br /> to the excavation plana prior to submittal : <br /> 1 . The l.+ndvwner agrees not to perform any excavation or <br /> grading within the S.S.J. I .D. easement or within 15 <br /> feet of the centerline of the pipeline , whichever is <br /> creator. <br /> 2 . Excavations aa3acent to District easements and/or <br /> facilities shall have a minimum 3 : 1 slope from the <br /> excavated field to the top of the berm. <br /> 3 . The landowner will take such steps as are required by <br /> the S. S .J . I .D . Water Superintendent to remedy any <br /> erosion on banks ad3acent to the District' s facilities . <br /> 1 <br /> 7r7kJ TccH n=1 •rr •T Hrnr Pnr KP-417 •nq:f7 qr;CT a=M 7C CT-LHW <br />
The URL can be used to link to this page
Your browser does not support the video tag.