My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004158
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
15322
>
2600 - Land Use Program
>
GX-92-03
>
SU0004158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:42 PM
Creation date
6/2/2020 2:46:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004158
FACILITY_NAME
GX-92-03
STREET_NUMBER
15322
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
15322 E HWY 120
RECEIVED_DATE
4/9/1992 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br /> 4 . No soil will lie stockriled over the S .S.J. I . D. <br /> pipeline. <br /> 5 . No heavy equipment will travel over the S .S .J. I .D. <br /> rireline without approved bridging, said bridging to be <br /> approved between S .S.J. I .D . and the contractor. <br /> 6 . No trees and/or rubbish will be disposed of or stored <br /> on the S.S .J. I .D. easement or facilities . <br /> 7 . S , g .J. I . D. will be notified 48 hours in advance of any <br /> excavation work . <br /> 8 . The landowner agrees that the existing pipeline or <br /> concrete lined canal do not presently leak and agrees <br /> that any damage will be repaired at landowner' s <br /> expense . <br /> 9 . It is understood by the applicant that the District <br /> shall not be held responsible to remedy high water <br /> table problems created by the excavation. <br /> 10 . Landowner shall provide District with sufficient fill <br /> dirt from excavation for protection of canal or <br /> pireline and place fill dirt as directed by District <br /> Engineering Department, <br /> 11. Any irrigation service structure (District or Private) <br /> modification or installation necessitated by the <br /> vrorozed excavation shall be rerfQrmed at the <br /> landowner' s expense . Furthermore , owner shall obtain a <br /> Structure Permit from the District Prior to installing, <br /> modifying , or removing any irrigation structures on <br /> District facilities . <br /> in conclusion, I would like to reiterate that these requirements <br /> are based upon previously approved standards that were generally <br /> considered acceptable in the past and should not be construed as <br /> being all-inclusive . Each and every item is still subject to <br /> review and approval or disapproval by the District ' s Board of <br /> Directors . <br /> If there are any questions , please feel free to contact me . <br /> Sincerely youz• , <br /> _,4 <br /> "am F. Bologna <br /> Engineering Department <br /> SB\vlc <br /> cc: Rick Bar-an <br /> a:\bologna\boersma. exc <br /> 2 <br /> .. - .-� -.-amu .-..-.ur. .-.�.-. -� ..+i - i ..... ri.�wU r� r.J r'. •r11�':R7 f7T.l"T RSM �r _f'T_IUI.I _ _-_ __ _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.