Laserfiche WebLink
Item No. 3 <br /> PC : 2-18-88 <br /> UP-88-20 <br /> Page 1 <br /> RECOMMENDATION <br /> It is recommended that the Planning Commission: <br /> 1 . Approve a Negative Declaration and instruct the Clerk to file <br /> a Notice of Determination; and <br /> 2 . Approve Use Permit Application No . UP-88-20 based on the <br /> Findings in the staff report and subject to the Conditions of <br /> Approval in the staff report . <br /> FINDINGS <br /> 1 . "The establishment , maintenance , and operation of the use <br /> does not conflict with the General Plan. " <br /> Staff can make this finding because the proposed project is <br /> consistent with the General Plan industrial policies , <br /> including Principle No. 6 , which addresses industrial uses <br /> which may require locations outside of urban centers . <br /> 2 . "Adequate utilities , access roads, sanitation, drainage , and <br /> other necessary facilities have been provided, and the pro- <br /> posed improvements are properly related to existing and pro- <br /> posed streets and highways . " <br /> Staff can make this finding because the proposed use is <br /> appropriate for the location, and conditions of approval <br /> have been proposed to insure that adequate facilities are <br /> provided. <br /> 3 . "The property involved is of adequate size and shape to <br /> accommodate the proposed use and all yards , building <br /> coverage , setbacks, parking areas, and other requirements of <br /> this Title . " <br /> Staff can make this finding because the site comprises a <br /> rectangular area 3 . 4 acres in size which can adequately <br /> accommodate the soil treatment facility. <br /> 4 . "Issuance of the permit will not be significantly detrimental <br /> to the public health, safety, or welfare or be injurious to <br /> the property or improvements of adjacent properties . " <br /> ° Staff can make this finding because the project site is <br /> sufficiently isolated from adjacent properties, and <br /> controls have been placed on the project as conditions of <br /> approval . <br />