Laserfiche WebLink
Item No. 1 <br /> PC : 3-10-88 <br /> UP-88-20 <br /> Page 3 <br /> During the cleansing cycle, the soil will be kept moist and mixed <br /> on a daily basis to insure that adequate oxygen and moisture <br /> reach the entire mass . Laboratory testing of soil samples will <br /> occur every two weeks to determine treatment progress. Once the <br /> processed soil is clean, it will be hauled by truck to its <br /> intended location as fill or soil material . It is estimated that <br /> up to 600 cubic yards of soil can be processed for each treatment <br /> cycle . <br /> Terra Genesis anticipates that the contaminated soil will come <br /> from abandoned or leaking fuel and gasoline storage tanks and <br /> from accidential petroleum spills. They expect to provide ser- <br /> vice within San Joaquin County. <br /> The officers of Terra Genesis are Michael Girdner, President , <br /> Richard Brew, Secretary, Dana Means, Director , and L. A. "Red" <br /> Moldenhauer, Director . <br />