My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002451
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PALM
>
11651
>
2600 - Land Use Program
>
UP-88-20
>
SU0002451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 1:15:49 PM
Creation date
6/2/2020 4:01:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002451
PE
2626
FACILITY_NAME
UP-88-20
STREET_NUMBER
11651
STREET_NAME
PALM
STREET_TYPE
LN
City
RIPON
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
11651 PALM LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No . 1 <br /> PC: 3-10-88 <br /> UP-88-20 <br /> Page 5 <br /> homesites and has direct access to State Route 99 via Austin <br /> Road. The nearest residential dwelling is approximately 1600 <br /> feet from the site, with scattered dwellings one-half mile or <br /> more from the site. Conditions of Approval have been recom- <br /> mended to control noise generation from the project and to <br /> restrict haul truck access south of Palm Avenue on Austin Road. <br /> Operational Characteristics : <br /> Each treatment cycle will be able to process up to 600 cubic <br /> yards, with an annual production of approximately 6, 000 cubic <br /> yards. <br /> The following steps describe the treatment process: <br /> 1 . The concrete slab ' s curbing will be sealed to prevent <br /> spillage of soil and water . <br /> 2 . Soil samples will be taken for laboratory analysis <br /> (petroleum hydrocarbon content) . <br /> 3 . Soil will be fertilized to bring nitrate and phosphorus <br /> level to at least 20 parts per million (ppm) and 5 ppm. <br /> Soil will be thoroughly mixed. <br /> 4 . Soil will be thoroughly wetted to bring the field moisture <br /> level in the soil to 30 - 70 percent . <br /> 5 . Prepare bacterial additive ; after incubation period, dilute <br /> and spray over the entire surface of the contaminated soil . <br /> 6 . Thoroughly mix the entire contaminated soil mass. <br /> 7 . Sprinkle the soil surface with water to maintain 30 - 70 <br /> percent moisture condition at all times. <br /> 8 . Repeat Items 6 and 7 above on a daily basis to ensure that <br /> adequate oxygen and moisture reach the entire mass. <br /> 9 . Take samples of soil every two weeks for laboratory analy- <br /> sis to determine treatment progress. <br /> 10. When laboratory analysis indicates that the soil ' s petro- <br /> leum hydrocarbon level has been reduced to meet the regula- <br /> tory agency' s acceptable standards, the cleansed soil is <br /> hauled away to its permanent resting place . <br /> 11 . The concrete slab will be "reloaded" as described above and <br /> treated as stated in Items 1 - 10 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.