My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002451
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PALM
>
11651
>
2600 - Land Use Program
>
UP-88-20
>
SU0002451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 1:15:49 PM
Creation date
6/2/2020 4:01:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002451
PE
2626
FACILITY_NAME
UP-88-20
STREET_NUMBER
11651
STREET_NAME
PALM
STREET_TYPE
LN
City
RIPON
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
11651 PALM LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Gary Reents <br /> Page 2 <br /> February 12, 1988 <br /> and other contaminated soil will be hauled to a Class I landfill or other <br /> approved site, if any, in compliance with regulations set forth by Federal , <br /> State, and Local authorities. All wastes intended for hauling to the Manteca <br /> site will be sampled and analyzed prior to being moved to said site. Soils <br /> containing contaminants other than those described above will not be moved <br /> to the Manteca site. <br /> Decontamination Cycle: <br /> Following is a summary of the decontamination cycle to be used at the Manteca <br /> site: <br /> I . The proposed lot of soil submitted for decontamination is located, <br /> identified, sampled and tested by a California State Certified <br /> Laboratory. If it is found to be acceptable for decontamination, it <br /> will be hauled by an approved hauling firm to the Terra Genesis <br /> decontamination facility near Manteca, California where it will be: <br /> 1. Spread on a six inch (6") thick concrete slab which has twelve <br /> inch (12") curbing for contaminant. <br /> 2. The contaminated soil will be eighteen inches ( 18") to twenty four <br /> inches (24") deep. <br /> II. The contaminated soil will be fertilized, â–ºnixed, watered, mixed and <br /> allowed to set for twenty four (24) hours after which time suitable <br /> bacteriological medium will be applied to the surface of the <br /> contaminated soil at which time the contaminated soil mass will be <br /> thoroughly mixed. <br /> III . During the next several weeks, the contaminated soil , which will be <br /> contained on the slab within the curbing, will be mixed and watered <br /> daily to the extent that water will not be pooled on the surface nor <br /> will the soil be totally saturated. <br /> IV. Air quality tests will be made as required by the San Joaquin County <br /> Air Pollution control Board. <br /> V. Soil samples will be taken as appropriate and analyzed in a California <br /> certified laboratory for contamination levels. <br /> VI. When the cleansed soil is approved by the appropriate regulatory agency, <br /> it will be hauled to the approved site for application, mixing, and <br /> planting. <br /> From the above, it should be noted that the soil is treated and totally <br /> removed from the decontamination site. It is then deemed decontaminated <br />
The URL can be used to link to this page
Your browser does not support the video tag.