Laserfiche WebLink
r <br /> SHEET NUMBER 2 <br /> of an air gap delivery from the irrigation system water supply, <br /> (see Site Map/Improvement Plan for details). <br /> It is anticipated that the first batch of treated soil will be used <br /> as fill for the roadway perimeter drainage apron and loading/unloading <br /> area. <br /> Once the Site Map/Improvement Plans are approved by the Public Works, <br /> Terra Genesis will meet with the San Joaquin Local Health District <br /> to discuss methods for meeting their Use Permit conditions. If you <br /> have any questions, please call me or Douglas Ries at (916) 756-2250. <br /> Sincerely, <br /> L. A. Moldenhauer, L.S. P.E. <br /> Vice President, Engineering <br /> LAM: rcw <br /> Enclosures <br /> cc: Department of Public Works, San Joaquin County Local Health District <br /> TERRA GENESIS <br /> A California Corporation <br />