Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> ■ ZONING AND GENERAL PLAN POLICIES <br /> 4.2-1 The project would conflict with 4.2-1(a) The removal of Prime Farmland is a significant unavoidable None necessary. --- <br /> many of the County's proposed adverse impact that cannot be mitigated. The only <br /> policies of the Revised Draft mitigation measure that could result in compliance with the <br /> General Plan 2010 as well as with County Policy to preserve prime agricultural land would be <br /> policies of the adopted Land denial of the project or approval of the project at an <br /> Use/Circulation Element of the alterative location. Aside from this one conflict with <br /> General Plan. County policies, the remaining recommended mitigation <br /> measures would reduce the impact to a level of <br /> insignificance. <br /> 4.2-1(b) If the project were approved at the proposed project site, the Refer to mitigation --- --- <br /> following mitigation measures should be required to protect measures in Section <br /> on-site and adjoining agricultural lands: a 1,000-foot wide 4.1. <br /> buffer at the site's wester edge; notification of property <br /> owners regarding the County's Right-to-Farm Ordinance; <br /> project contributions towards an agricultural land trust; <br /> inclusion of lands designated for agricultural use within the <br /> project site boundaries; and redesignation of vacant lands <br /> from urban to agricultural use elsewhere in the County. Tlme <br /> County currently has a private, non-profit farmland trust <br /> which can accept donations to be used for the permanent <br /> protection of farmland. A policy to support this trust is <br /> included in the Revised Draft General Plan 2010. <br /> 4.2-1(c) To create an urban center for the project, the core Review at Specific SJCCDD SP <br /> commercial areas of the project should be able to exceed the Plan stage. <br /> 45-foot height limit under special circumstances (e.g., <br /> provision of underground or structured parking within <br /> commercial buildings or inclusion of affordable housing in <br /> mixed-usc areas). <br /> 4.2-1(d) Additional neighborhood commercial centers should he Review 4," 170nal GVA SJCCDD ('tom',^ SP <br /> included. '11mree school/park areas at the site's wester t at SP stage. <br /> boundary should be relocated farther east to be more central <br /> to residences. <br /> 'S.ICCDD:San Joaquin County Community Development Department; S.I031):San.loagt in County Building Division;SJCDPW San Joaquin County Department of Public Works;USACF: U.S.Army Corps <br /> of Engineers; SJCFCE: San Joaquin County Flood Control F ngincer. CSD:('otnnutnity Services District(of project); RWQCB: Regional Water Quality Control Board;CDFG:California Departmcnt of Fish <br /> and Game;SJCEHD:San Joaquin County Fnvironmental I lealth Department;DI IS:California Department of Health Services;I.AFCO:I,0cal Agency Fornnalion Comtnission. Those responsible would maintain <br /> nnonitoring records and verify compliance with mitigation measure. <br /> -GPA: General Plan Amendment stage: SP: Specific Plan stage; PC: Pre-construction stage: (includes Tentative Map app;:cwaa-aF and Final Map approvals and other discretionary application <br /> approvals): - Construction stage (prior to building permit issuance): O: Operational stage. <br />