Laserfiche WebLink
7.1 MITIGATION MONITORING PROGRAM <br /> Public Services <br /> Table 7.1 - confinrted <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> ■ PUBLIC SERVICES/Fire Protection Service <br /> 4.3.3-1 The proposed project would 4.3.3-1(a) Institutional arrangements for providing fire protection Rcview at SP stage. SJCCDD SP <br /> temporarily increase the demand service should be finalized in the Specific Plan. <br /> for local fire protection service <br /> until on-site services are provided. <br /> Plans to provide this service have <br /> not been finalized by the applicant. <br /> 4.3.3-1(b) The Specific Plan should include policies relative to fire flow Review at SP stage. SJCCDD SP <br /> requirements. funding assistance for the construction of fire <br /> stations. and ownership of the fire stations. <br /> ■ PUBLIC SERVICES/Police Protection Service <br /> 4.3.4-1 The proposed project would 4.3.4-1 Institutional arrangements for providing police services Review at SP stage. SJCCDD SP <br /> temporarily increase the demand should he finalized in the Specific Plan. <br /> for police services from the County <br /> Sheriffs Department. <br /> 4.3.4-2 The number of marine patrols 4.3.4-2(a) "Il,e applicant's public safety plan should include provisions Review at SP stage. S.ICCDD SP <br /> both In San Joaquin and Contra to patrol the Mountain [louse marina and the immediate <br /> Costa counties would be vicinity of the marina. <br /> insufficient at project buildout to <br /> provide effective law enforcement <br /> along Old River and in the Delta <br /> within the project vicinity. <br /> 4.3.4-2(b) Ines. based on the number of berths. should be assessed to Review at adoption of SJCCDD Adoption of <br /> help offset costs for maintaining the Sheriff's Department Development "title. Development <br /> Marine Patrol Division In both San Joaquin and Contra Title and <br /> Costa counties. PC. <br /> 4.3.4-2(c) The Specific Plan should incorporate crime prevention Review at SP stage. S.ICCDD SP and PC <br /> policies such as providing security fencing. good lighting. <br /> visible herth numbers, and locked fates on boat docks for <br /> the marina and related facilities. <br />