Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring <br /> ■ PUBLIC SERVICES/Solid and Hazardous Waste <br /> 4.3.5-1 Solid waste projected for project 4.3.5-1 "Ilic Specific flan should incorporate policies to reduce the Review at SP stage SJCCDD; SP, PC,and <br /> buildout could be 67,850 tons per waste stream generated by the Mountain House project. and during operations. SJCDPW O <br /> year without implementing a Such programs should include establishing a curbside <br /> recycling program. Solid waste recycling program; a commercial recycling program; <br /> generated by the project would provision for on-site recycling centers, transfer stations, and <br /> contribute to the reduction in composting; and a public information program. Policies <br /> landfill capacity. should Include the County's Waste Plan Format for <br /> development projects. <br /> ■ PUBLIC SERVICES/Libraries <br /> 4.3.6-1 The proposed project would 4.3.6-1 Planning for and constructing an on-site library with a Review at SP stage. SJCCDD SP <br /> increase demand for library minimum of 10.000 square feet should begin in Phase II. By <br /> services. full project buildout, an additional 12,000 square-foot library <br /> should be constructed at the project site. <br /> ■ PUBLIC UTILITIES/Water <br /> 4.4.1-1 If lands within the project site that 4.4.1-1(a) Annexation of the unincorporated portions of the project Submittal of Contra Costa SP <br /> are currently outside the Byron- site and of the portions of the project site that are within the annexation approval County; <br /> Bethany Irrigation District (BBID) Westside Irrigation District and Plain View Water District document to SJCCDD LAFCO; and <br /> were not annexed, development should be initiated. The annexation negotiations should be prior to approval of SJCCDD <br /> could not occur until alternative EAit+ated completed prior to the approval of the Specific SP. <br /> water sources were secured. If Plan through the Contra Costa County or San Joaquin <br /> groundwater resources were County Local Agency Formation Commission. These <br /> available and developed in those negotiations should ascertain whether annexation of the <br /> portions. overdrafting of unserved portions of the project site and the portion of the <br /> groundwater may occur. project site within the Westside Irrigation District to BBID <br /> is possible. <br /> 'S.tC'CDD:San Joaquin County Community Development Department; S1CBD:San.loaquin County Building Division;SJCDPW San Joaquin County Department of Puhlic Works;USACE: U.S.Arany Corps <br /> of Engineers; SJCFCE: San Joaquin County Flood Control Engineer; CSD:Community Services District(of project); RWQC'B: Regional Water Quality Control Board;CDFG: California Department of Fish <br /> and Game;SJCEIID:San Joaquin County Environmental Health Department;IN IS:California Department of t lealth Services;IAFCO:Local Agency Formation Conunissinn. Those responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> 'GPA: General Plan Amendment stage; SP: Specific Plan stage: PC: Pre-construction stage: (includes Tentative Map appFauRI Q and Final Map approvals and other discretionary application <br /> approval,' C: Construction stage (prior to building permit issuance): O: Operational stage. <br />