My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013380
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
0
>
2600 - Land Use Program
>
GP-89-11
>
SU0013380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 4:22:18 PM
Creation date
6/2/2020 4:07:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013380
PE
2600
FACILITY_NAME
GP-89-11
STREET_NUMBER
0
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376-
APN
20904003
ENTERED_DATE
5/29/2020 12:00:00 AM
SITE_LOCATION
PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.1 MITIGATION MONITORING PROGRAM <br /> Public Utilities <br /> Table 7.1 - continued <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.4.1-1(b) If annexation to BBID were not approved, the applicant Approval of hydro- SJCDPW and SP <br /> should secure an adequate water sup ly for the areas outside logical assessment by SJCCDD <br /> BBID prior to approval of the Specific Plan. If groundwater SJCDPW. Proof of <br /> resources were to be used, a thorough hydrogeological water supply to be <br /> assessment of local aquifers must be performed. provided to SJCDPW. <br /> Alteratives could include: scaling down the project to fit <br /> wholly within the boundaries of BBID; utilization of <br /> available riparian water rights that are In place for the <br /> land north of Byron Road; developing a conjunctive use <br /> plan which entails time storage of surface water in a <br /> groundwater basin; obtaining a separate water supply from <br /> the State Water Project or Federal Central Valley Project: <br /> and demonstrating adequate groundwater resources to serve <br /> the project. <br /> 4.4.1-2 If the State Water Resources 4.4.1-2 The project proponent should demonstrate a reliable water Submittal of copy of SJCDPW: SP <br /> Control Board (SWRCB) denies supply throughout time calendar year prior to approval of the written agreement with SJCCDD <br /> BBID's application for winter Specific Plan. BBID to SJCDPW <br /> water rights, the absence of a year- prior to Specific Plan. <br /> round surface water supply to the If 13131D agreement <br /> project could result in the lack of a not possible, other <br /> surface water supply to the project verification to be <br /> during the winter months. If provided by SJCDPW. <br /> groundwater resources were <br /> available and developed in the <br /> project to augment the surface <br /> water supply, overdrafting of local <br /> groundwater may occur if no <br /> alternate winter water supply is <br /> procured. <br /> 4.4.1-3 Changing part of BBID's service 4.4.1-3 The applicant should execute in enforceable agreement with Refer to 4.4.1-2 alx)vc. SJCDPW: SP <br /> area from agricultural water use to 1313ID prior to approval of the Specific Plan to supply water SJCCDD <br /> municipal/industrial water use to the project site, which would protect BBID and its <br /> would create institutional issues customers from economic loss and water interruption. <br /> requiring resolution. Without <br /> resolution, a reliable water supply <br /> could not be guaranteed. <br /> Indirectly. impacts to agricultural <br /> operations could occur due to the <br /> potential for rising water costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.