Laserfiche WebLink
7.1 MITIGATION MONITORING PROGRAM <br /> Public Utilities <br /> Table 7.1 - continued <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.4.1-1(b) If annexation to BBID were not approved, the applicant Approval of hydro- SJCDPW and SP <br /> should secure an adequate water sup ly for the areas outside logical assessment by SJCCDD <br /> BBID prior to approval of the Specific Plan. If groundwater SJCDPW. Proof of <br /> resources were to be used, a thorough hydrogeological water supply to be <br /> assessment of local aquifers must be performed. provided to SJCDPW. <br /> Alteratives could include: scaling down the project to fit <br /> wholly within the boundaries of BBID; utilization of <br /> available riparian water rights that are In place for the <br /> land north of Byron Road; developing a conjunctive use <br /> plan which entails time storage of surface water in a <br /> groundwater basin; obtaining a separate water supply from <br /> the State Water Project or Federal Central Valley Project: <br /> and demonstrating adequate groundwater resources to serve <br /> the project. <br /> 4.4.1-2 If the State Water Resources 4.4.1-2 The project proponent should demonstrate a reliable water Submittal of copy of SJCDPW: SP <br /> Control Board (SWRCB) denies supply throughout time calendar year prior to approval of the written agreement with SJCCDD <br /> BBID's application for winter Specific Plan. BBID to SJCDPW <br /> water rights, the absence of a year- prior to Specific Plan. <br /> round surface water supply to the If 13131D agreement <br /> project could result in the lack of a not possible, other <br /> surface water supply to the project verification to be <br /> during the winter months. If provided by SJCDPW. <br /> groundwater resources were <br /> available and developed in the <br /> project to augment the surface <br /> water supply, overdrafting of local <br /> groundwater may occur if no <br /> alternate winter water supply is <br /> procured. <br /> 4.4.1-3 Changing part of BBID's service 4.4.1-3 The applicant should execute in enforceable agreement with Refer to 4.4.1-2 alx)vc. SJCDPW: SP <br /> area from agricultural water use to 1313ID prior to approval of the Specific Plan to supply water SJCCDD <br /> municipal/industrial water use to the project site, which would protect BBID and its <br /> would create institutional issues customers from economic loss and water interruption. <br /> requiring resolution. Without <br /> resolution, a reliable water supply <br /> could not be guaranteed. <br /> Indirectly. impacts to agricultural <br /> operations could occur due to the <br /> potential for rising water costs. <br />