Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> ■ PUBLIC UTILITIES/Wastewater <br /> 4.4.2-1 Inadequately treated reclaimed 4.4.2-1(a) 'nie applicant should initiate the permitting process with the Submittal of approved RWQCB; SP and PC <br /> wastewater may result in the California Department of Health Services, Office of DTSC and RWQCB DTSC; and <br /> discharge of untreated or partially Drinking Water and the Central Valley Regional Water permit or permit SJCDPW <br /> treated wastewater to fields Quality Control Board for the proposed wastewater request to SJCDPW at <br /> adjacent to the site that could reclamation system prior to the Specific Plan. This would SP review stage. Final <br /> impact local surface and provide for early identification of constraints. The permits to be <br /> groundwaters and public health. Wastewater Discharge Permit must be issued before submitted to SJCDPW <br /> construction begins. prior to construction. <br /> 4.4.2-1(b) "fhe applicant should develop a reclaimed wastewater Review at SP stage. SJCDPW and SP and O <br /> irrigation plan that incudes specifications for individual Verification of SJCEIID <br /> irrigation system designs, irrigation practices, and monitoring compliance on annual <br /> of actual watering practice to determine compliance with basis during <br /> permit restrictions. The plan should also Identify how operations. <br /> adequate acreage necessary for Irrigation with <br /> reclaimed water would be guaranteed. <br /> 4.4.2-1(c) For the Specific Plan, the applicant should provide a Review at SP stage. SJCDPW and SP <br /> preliminary design and plant layout of the reclaimed SJCCDD <br /> wastewater treatment plant including water storage facilities. <br /> 4.4.2-2 Discharging treated wastewater or 4.4.2-2(a) More on-site reclamation opportunities should be Review at SP stage. SJCCDD and SP <br /> other waste to Old River could investigated to reduce the surface water discharge and to SJCDPW <br /> adversely impact local water reduce the project's water demand. Such opportunities <br /> resources and public health. should be identified in the Specific Plan for the project. <br /> 4.4.2-2(b) M off-site reclamation system should be developed that is Review at SP stage. SJCDPW; PC <br /> sized to meet as much wastewater as possible up to the SJCCDD; and <br /> entire annual flow. Such a system should be identified in the SJCBD <br /> Specific flan for the project. <br /> 'SJCCDD:San Joaquin County Community Development Department: SJCHD:San Joaquin County Building Division;SJCDPW San Joaquin County Department of Public Works;USACE: U.S.Army Corps <br /> of Engineers; SJCFCE: San Joaquin County Flood Control Engineer. CSD:Community Services District(of project); RWQCB: Regional Water Quality Control Board:CDFG:California Department of Fish <br /> and Game;SJCEIID:San Joaquin County Environmental I lcalth Department:DI IS:California Department of I Icalth Services;LAFCO:Local Agency Formation Commission. "Iliose responsible would maintain <br /> monitoring records and verify compliance with mitigation nmcasure. <br /> GPA: General Plan Amendment stage: SP: specific Plan stage: PC: Pre-construction stage: (includes Tentative Map appFOVAI PF and Final Map approvals and other discretionary application <br /> approvals)- Construction stage (prior to building permit issuance): O: Operational stage. <br />