Laserfiche WebLink
7.1 MITIGATION MONITORING PROGRAM <br /> Public Utilities <br /> Table 7.1 -continued <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.4.2-2(c) If sufficient land were not available to reclaim all of the Submittal of approved SJCDPW and SP and PC <br /> treated wastewater, an application for the proposed application by SJCDPW <br /> wastewater discharge to Old River should be submitted for RWQCB at SP stage. <br /> consideration by the Central Valley Regional Water Quality <br /> Control Board prior to Specific Plan approval and a <br /> permit should be obtained prior to project construction. <br /> 4.4.2-2(d) The wastewater treatment plant should be designed with a Review of preliminary SJCDPW; SP and PC <br /> high degree of redundancy for every unit process to plant design at SP SJCBD; and <br /> minimize the potential for incomplete treatment. stage. SJCCDD <br /> 4.4.2-2(c) An aggressive public education campaign should be Submittal of SJCDPW O (annually) <br /> considered in developing the Specific Plan to inform the educational materials <br /> public of what wastes could be disposed of in the sanitary for review and <br /> sewer and what alternative disposal options are available for approval. <br /> other wastes. The program should include information <br /> regarding alternative household chemicals that are the least <br /> environmental) harmful. <br /> 4.4.2-2(f) A pretreatment program should be considered in developing Review at SP stage. SJCCDD and SP <br /> the Specific Plan. The program would be designed to SJCDPW <br /> educate and regulate businesses regarding what may be <br /> discharged to the sanitary sewer. <br /> 4.4.2-2(g) A hazardous waste collection program should be Submittal of, SJCCDD and SP and O <br /> implemented by the Community Services District to provide preliminary program SJCDPW <br /> readily availahlc disposal options for residents within the at SP stage. <br /> project. Verification during <br /> operations. <br /> 4.4.2-2(h) During construction for any project phase, all Vcrify prior to SJCBD and PC <br /> agricultural drains under the Impacted project areas are construction. SJCCDD <br /> to should be removed or abandoned In place to <br /> eliminate the potential for the drains to act as <br /> contamination conduits. All drains should be <br /> eliminated at project build-out. All plans for relocation <br /> or removal of agricultural drains should be approved by <br /> the RWQCB. <br />