Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.4.4-1 The proposed land use plan 4.4.4-1(a) The applicant should formally apply to PG&E to relocate Review at SP stage. SJCCDD SP and PC <br /> appears to violate PG&E and underground the Weber-I-Ierdlyn 60 kV electrical <br /> restrictions for uses within transmission line. A preliminary response and cost estimate <br /> electrical transmission line and from PG&E should be secured and documented in the <br /> natural gas pipeline easements and Specific Plan. <br /> does not provide adequate <br /> corridors for planned utility <br /> easements. <br /> 4.4.4-1(b) The applicant should formally apply to PG&E to relocate Review at SP stage. SJCCDD SP and PC <br /> the eight-inch natural gas pipeline. A preliminary response <br /> and cost estimate from PG&E should be secured and <br /> documented in the Specific Plan. <br /> 4.4.4-1(c) An adequate open space corridor or appropriate land Review at SP stage. SJCCDD SP <br /> use plan which meets PG&E approval should be provided <br /> for the Rio Oso-Tesla and proposed Rancho Seco-Tesla <br /> transmission line corridors (see Section 4.12. Public Ilealth <br /> and Safety section of this DEIR). PG&E's approval should <br /> be secured and documented in the Specific Plan. <br /> 4.4.4-1(d) Development within electrical overhead transmission Submittal of approval SJCCDD PC <br /> easements must not restrict access to the towers or interfere of plans by PG&E. <br /> with the tower footings or wires, and must receive prior <br /> approval from PG&E. Development in easements associated <br /> with buried pipelines should not disturb soil cover over the <br /> pipelines, and must receive prior approval from PG&E or <br /> other owners of easements. <br /> 4.4.4-1(e) The applicant should submit construction plans to Review at SP stage. SJCCDD SP <br /> PG&E for review. In particular, the proposed land uses <br /> in PG&E easements and movement of heavy machinery <br /> over the Line No. 2 gas pipeline should be addressed. <br /> PG&E's approval should be secured and documented <br /> in the Specific Plan. <br /> 'SJCCDD: San Joaquin Comfy Conm unky I-)evelopment Department: SJC111):San Joaquin County Building Division;SJCDPW San.loaquin County Department of Public Works,USACR U.S.Army Corps <br /> of Engineers; S.ICFCI : San Joaquin County Flood Control Engineer; CSD: Community Services District(of project): RWQCB: Regional Water Quality Control Board;CDFG:California Department of Fish <br /> and Game:S.ICEHD:San Joaquin County Environmental I lealth Department:DI IS:California Department of I Iealth Services,LAFCO:Local Agency Formation Commission. Those responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> GPA: General Plan Amendment stage: SP: Specific Plan stage; PC: Pre-construction stage: (includes Tentative Map approval or and Final Map approvals and other discretionary application <br /> approvals): '-- Construction stage (prior to building permit issuance): O: Operational stage. <br />