Laserfiche WebLink
7.1 MITIGATION MONITORING PROGRAM <br /> Public Utilities <br /> Table 7.1 -continued <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitorine <br /> 4.4.3-4 The accumulation of floating 4.4.3-4(a) Surface barriers near the inlets to detention ponds should be Review at SP stage. SJCDPW and SP and O <br /> debris and petroleum residual in considered to contain floating debris and residual SJCCDD <br /> detention ponds could create a hydrocarbon within a small area of the basins to allow for <br /> nuisance condition (e.g.. odors, easier cleanup. The performance standards and design <br /> mosquito infestation, and excessive features to achieve containment should be included in the <br /> algae growth) and cause adverse Specific Plan. <br /> aesthetic effects. <br /> 4.4.3-4(b) Landscaping in and around detention ponds should be Review at SP stage. SJCCDD: SP and O <br /> maintained free from litter and in healthy condition. To the SJCDPW: <br /> extent feasible, native drought tolerant plants should be and SJC13D <br /> used. landscaping plans and maintenance activities should <br /> be described in the Specific Plan. <br /> 4.4.3-4(c) Equipment for removing floating debris and cleaning up Review at SP stage. S.ICCDD and SP and O <br /> petroleum products from the basins should always be SJCDPW <br /> available within the project site. Description of the <br /> equipment and other necessary materials should be provided <br /> in the Specific Plan. <br /> 4.4.3-4(d) Frequent inspection of detention ponds (e.g., daily during Review at SP stage. SJCCDD and SP and O <br /> rain storms, weekly during dry periods) should be conducted SJCDPW <br /> and the findings recorded. Inspection objectives, types of <br /> activities, approximate frequencies of Inspections, and <br /> recordkecping plans should be included in the Specific Plan: <br /> a detailed description of inspection activities should be <br /> incorporated Into an Operations and Maintenance <br /> Manual for the storm water collection system. <br /> 4.4.3-4(e) Adequate access should be ensured for maintenance of all Review at SP stage. S.ICCDD and SP and PC <br /> detention basins. Pond layouts should be provided in the SJCDPW <br /> Specific Plan. <br /> 4.4.3-5 Construction of the proposed 4.4.3-5 Time development should be designed and constructed such Review at SI' stage. SJCCDD and SP <br /> project in phases could interfere that BBID operations are not interrupted. The Specific I'lan S.IC13D <br /> with the operations of BBID's should address how this is to be accomplished. <br /> water distribution canals. <br /> agricultural tile drains. and surface <br /> drainage channels. <br />