My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013380
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
0
>
2600 - Land Use Program
>
GP-89-11
>
SU0013380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 4:22:18 PM
Creation date
6/2/2020 4:07:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013380
PE
2600
FACILITY_NAME
GP-89-11
STREET_NUMBER
0
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376-
APN
20904003
ENTERED_DATE
5/29/2020 12:00:00 AM
SITE_LOCATION
PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring' <br /> 4.5-2 Development of the proposed 4.5-2 The County Coroner, the Native American Heritage if needed, consultation SJCCDD C (as <br /> project could disturb previously Commission, and an archaeologist should be informed and and finalization of needed) <br /> unknown human prehistoric burial consulted if a human prehistoric burial site were discovered. written agreement. <br /> sites. An agreement should be formulated between the Native Compliance with <br /> American representative, the archaeologist, San Joaquin agreement to be <br /> County, and the developer with regard to the proper monitored. <br /> treatment and disposition of human remains and associated <br /> artifacts in the Specific Plan. Such treatment and disposition <br /> may require archaeological excavation and reburial. <br /> 4.5-3 The proposed project could 4.5-3 When specific land use information and detailed Review at SP stage. SJCCDD SP and PC <br /> destroy historic structures over 50 infrastructure planning is presented as part of the Specific Survey prior to <br /> years of age. Plan, a determination should be made as to whether any of construction. <br /> the structures or structural complexes described in this <br /> DEIR would be impacted. All such structures should be <br /> evaluated by an architectural historian. After evaluations are <br /> made and if any adverse impacts are identified, mitigation <br /> measures should be suggested and followed. Such mitigation <br /> might consist of avoidance of impacts, detailed architectural <br /> documentation and history, or removal of a building to <br /> another location. <br /> 4.5-4 The proposed project could 4.5-4 The applicant should stay In contact with the National Review at SP stage SJCCDD SP and PC <br /> Impact the route of the Park Service with regard to the development of Its <br /> projected DeAnza Trail, a comprehensive plan for the DeAnza Trail. If the <br /> National Historic Trail. commemorative trail will pass through the project site, <br /> the Mountain House Specific Plan should Incorporate <br /> the DeAnza trail using historic markers along the route <br /> and, preferably, develop a multi-use recreational and <br /> historic interpretive trail which would Incorporate the <br /> projected route of the DeAnza Trail. <br /> 'S.ICCDD: San.loaquin County Community Development Deparunent; SJUBD:San Joaquin County Building Division;SJCDPW San Joaquin County Department of Public Works;USACF: U.S.Army Corps <br /> of Frigincers; S.ICFCF- San Joaquin County Flood Control Engineer, CSD:Community Services District(of project); RWOCB: Regional Water Quality Control Board:CDFG: California Department of Dish <br /> and Game:S.ICEI ID:San Joaquin County Environmental Health Department:DI IS:California Department of Health Services;LAFCO:Local Agency Formation Commission. Tbosc responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> ' GPA: General Plan Amendment stage; SP: Specific Plan stage; PC: Pre-construction stage: (includes Tentative Map appFoual os and Final Map approvals and other discretionary application <br /> approvals)- Construction stage (prior to building permit Issuance); O: Operational stage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.