Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.7-2 Increased runoff within the 4.7-2 Although the applicant has presented preliminary design Monitor completion SJCFCE SP and PC <br /> watershed and channel measures to reduce the erosion hazards, a specific channel and implementation of <br /> modification of Mountain house design and maintenance plan should berepared and channel design. <br /> Creek could result in increased presented in the Specific Plan. The specifc channel design <br /> erosion. should incorporate riparian vegetation to the greatest extent <br /> possible. The design measures should also provide for <br /> protection of and any necessary Improvements to <br /> existing culverts and stream crossings within the <br /> drainage system. The use of pervious pavements should <br /> be incorporated into the design of parking and pedestrian <br /> areas to increase infiltration of storm water runoff. The <br /> design and maintenance plan should present specific <br /> channel maintenance procedures and schedules to be <br /> implemented by the Community Services District to <br /> protect the channel and associated structures during <br /> and after the development of the project. The channel <br /> design and maintenance plan should be reviewed and be <br /> subject to the approval of the San Joaquin Flood Control <br /> Engineer. <br /> 4.7-3 Increased sedimentation in the 4.7-3(a) Sediment discharge to Mountain I-louse Creek should be Review at SP stage. SJCCDD and SP <br /> proposed wetland area at the controlled. Appropriate control of erosion within the project SJCFCE <br /> terminus of Mountain House area, which would contribute to the sediment load, was <br /> Creek and within Old River would discussed in Mitigation Measure 4.7-2. The discharge of <br /> be caused by runoff from sediment to Old River should also be minimized by causing <br /> Mountain House Creek and sediment deposition to occur in areas within the Mountain <br /> operation of the proposed marina. House Creek channel. The Mountain House Creek channel <br /> should be enlarged upstream of the wetlands area to reduce <br /> flow velocities and cause sediment deposition. An <br /> appropriate channel design should be required as part of the <br /> Specific Plan and subject to review and approval by the San <br /> Joaquin flood Control Fngincer. <br /> 'SJCCDD:San Joaquin County Community Development Department; SJCBD:San.foaquin County Building Division;SJCDPW San Joaquin County Department of l'uhlic Works;USAC R U.S.Army Corps <br /> of Engineers; SJCFCE: San Joaquin County 1 710o Control Engineer, CSD:Community Services District(of project); RWQCB: Regional Water Quality Control Board; CDFG: California Department of Fish <br /> and Gante:SJCEl1D:San Joaquin County Environmental Health Department:DIIS:California Department of health Services:LAFCO:Local Agency Formation Commission. Those responsible would maintain <br /> monitoring records and verify compliance with mitigation mca_sure. <br /> ' GPA: General Plan Amendment stage: SP: Specific Plan stage; PC: Pre-construction stage: (Includes Tentative Map apprcws!c r and Final Map approvals and other discretionary application <br /> approvals' Construction stage (prior to building permit issuance); O: Operational stage. <br />