Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> ]impact Mitigation Measure Requirements Responsihler Monitoring= <br /> 4.11-3 The least-expensive housing 4.11-3 The County should develop guidelines for an affordable Review at SP stage. SJCCDD O (annually) <br /> proposed for development at the housing plan for new communities. This plan should be part Biannual report. <br /> project site may not be affordable of the required Specific Plan and should be geared towards Verification of <br /> for low-income residents of San the unique housing mix requirements of a new town. It compliance with policy <br /> Joaquin County. should be sensitive to the long term housing needs of the prior to each new <br /> community. For example, even if there is no retirement development phase. <br /> housing planned initially, long term residents may create that <br /> demand in 20 years or so. <br /> 4.11-4 The proposed project would 4.11-4 The reduction of population and employment growth in None necessary. --- - <br /> capture demand for some "Tracy that results from implementation of the proposed <br /> residential and nonresidential land project cannot be mitigated unless the project is denied, or <br /> uses that would otherwise go to the project becomes part of the City of'Tracy. <br /> the City of Tracy. <br /> ■ PUBLIC HEALTH AND SAFETY <br /> 4.12-1 Potential past or future releases of 4.12-1(a) Preliminary site assessments, in accordance with the Completion of site SJCEDH PC <br /> fuel products from storage tanks requirements of the County Environmental Health assessments by quali- <br /> andJor pipelines may result in Department, should he undertaken by a qualified tied professional and <br /> environmental degradation and professional in areas of known or suspected fuel releases, approval of assessment <br /> public health hazards. prior to development. by SJCEIID. <br /> 4.12-1(b) Any contamination identified by the preliminary assessments Investigation and SJCEHD PC <br /> should be investigated and remediated, if required, prior to remediation by a quali- <br /> construction to reduce potential exposure of construction fied professional. <br /> workers and the public to hazardous materials and to Verification of <br /> prevent further environmental degradation. Remediation of remediation by <br /> sods could include excavation and on- or off-site treatment SJCI,IIU. <br /> or disposal or in-place treatment of the affected soils. <br /> 'SJCCDD: San Joaquin County Community Development Department; SJCBD:San.loaquin County Building Division;SJCDPW San Joaquin County Department of Puhlic Works;USACE: U.S.Anny Corps <br /> of Engineers: S.ICFCE: San Joaquin County Flood Control Engineer, CSD:Community Services District (of project); RWQC13: Regional Water Oualitv Control Board;CDFG: California Department of Fish <br /> and Gantc:S,ICIiI11):San Joaquin County 1'.nvirnnntental Health Department;DI IS:California Department of Health SCNtccs;LA CO:I Alcal Agency formation Commiggion. 'More responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> GPA: General Plan Amendment stage: SP: Specific Plan stage; PC: Pre-construction stage: (includes Tentative Map apffOVal OFand final Map approvals and other discretionary application <br /> approvals); ^ Construction stage (prior to huilding permit issuance); O: Operational stage. <br />