Laserfiche WebLink
7.1 MITIGATION MONITORING PROGRAM <br /> Public Health and Safety <br /> Table 7.1 continued <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.12-1(c) If the groundwater had been affected by fuel releases, Verification of RWQC13 and PC <br /> remediation could be required. Such remediation could remediation. if SJCEHD <br /> include: groundwater extraction and treatment; disposal of necessary. <br /> the treated water to surface waters; or reinjection into the <br /> groundwater. Extraction of groundwater without reinjection <br /> could affect the water resource supplies in the area. <br /> 4.12-1(d) The location of all existing and abandoned fuel lines Review at SP stage. SJCCDD SP and PC <br /> should be established In the Specific Plan so that any Provision of required <br /> required setbacks can be Incorporated. Prior to map to SJCCDD. <br /> construction near the existing and abandoned buried fuel <br /> l lines, the location of the lines should be assurately further <br /> established (e.g., accurate maps from the owner and/or <br /> operator or geophysical surveys). <br /> 4.12-1(e) All construction near the existing or abandoned fuel lines Completion and SJCEIiD and PC and C <br /> should be undertaken following a site-specific health and approval of the health RWQC13 <br /> safety plan to protect the welfare of the workers. If and safety plan. Veri- <br /> contamination were identified, investigation and remediation fication of compliance <br /> should be undertaken in accordance with the requirements with plan and <br /> of the County and the Regional Water Quality Control remediation, if <br /> Board. necessary. <br /> 4.12-1(t) Construction at the locations of aboveground fuel storage Completion and SJCEHD and PC and C <br /> tanks should occur in accordance with site-specific health approval of the health RWQC13 <br /> and safety plans unless it has been previously determined and safety plan. Veri- <br /> that releases have not occurred from the operation of the fication of compliance <br /> tanks. Such determination could be made by inspection of with plan and rcmedi- <br /> the tanks and/or soil sampling under or near the tanks. ation. if necessa . <br /> 4.12-1(g) The applicant should obtain the approval of owners of Review prior to SJCEHD PC <br /> buried fuel pipelines that cross the project site for construction. <br /> construction and development plans. <br /> 4.12-2 Public and environmental health 4.12-2(a) A preliminary assessment of the presence of chemical Completion of assess- SJCEIID and SP <br /> may he affected by potential residues from pesticide and herbicide use should be ment by qualified San Joaquin <br /> historic pesticide and/or herbicide completed by a qualified professional prior to approval of professional. Approval County <br /> residues in the environment. the Specific Plan. of assessment by Agricultural <br /> SJCEI ID. Commis- <br /> sioner <br />