My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013380
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
0
>
2600 - Land Use Program
>
GP-89-11
>
SU0013380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 4:22:18 PM
Creation date
6/2/2020 4:07:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013380
PE
2600
FACILITY_NAME
GP-89-11
STREET_NUMBER
0
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376-
APN
20904003
ENTERED_DATE
5/29/2020 12:00:00 AM
SITE_LOCATION
PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring' <br /> 4.12-2(b) Specific areas where pesticides and herbicides were stored, Investigation by quali- SJCEHD SP PC <br /> handled, or disposed of should be investigated prior to fied professional and <br /> dOWSIOPRIORt Of 010 Sf*GifiC PAR fOF the construction at approval by SJCEHD. <br /> the project site. <br /> 4.12-2(c) If chemicals were detected at concentrations that could pose Verification of remedi- DTSC. PC <br /> a risk to the environment, remediation of the affected areas ation, if necessary. RWQCB, and <br /> should be undertaken prior to project construction. S.ICEIID <br /> Remediation should be conducted in accordance with the <br /> requirements of either the California Department of Toxic <br /> Substances Control and/or the Regional Water Quality <br /> Control Board. Remediation could include soils removed to <br /> a permitted landfill, on-site treatment and on- or off-site <br /> disposal, or placement of affected soils in areas that would <br /> not provide exposure to users of the site. <br /> 4.12-2(d) Pesticide- and herbicide-containing soils (with concentrations Verification of com- SJCEIID PC <br /> in excess of regulatory action levels) should not be placed or pletion of recom- <br /> exposed in residential development areas where residents mended procedures <br /> could be exposed to the chemicals through ingestion, identified in investi- <br /> inhalation, or skin contact. gation (4.12-2(b)). <br /> 4.12-2(e) Following grading activities in residential areas, the applicant Soil sampling by quali- SJCEIID C <br /> should demonstrate to the County that exposed soils do not fied professional and <br /> contain pesticides or herbicides in excess of regulatory action report to verify <br /> levels. compliance. <br /> 4.12-2(f) To reduce the potentially adverse effects of aerial pesticide Refer to 4.1-2(a). SJCEIID SP <br /> spraying on the health of residents and employees of the <br /> project site, a UM-foot wide buffer zone should be <br /> established along the western site boundary or aerial <br /> spraying shall be restricted. <br /> 'S.ICCDD: San Joaquin Couniv Community Development Department: SJCBD:San Joaquin County Building Division;SJCDPW San.Joaquin County Departnnent of Public Works;USACE: U.S.Arany Corps <br /> of Engineers; SJCFCE: San Joaquin Crnmty Flood Control langineer; CSD:Community Services District(of project); RWQCB: Regional Water Quality Control Board;CDFG: California Department of Dish <br /> and Game;SJCEHD:San.loaquin County Environmental Health Department; DI IS:California Department of Health Services;IAFCO:Local Agency Formation Commission. "Those responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> GPA: General Plan Amendment stage; SP: Specific Plan stage: VC: Pre-construction stage: (includes Tentative Map app;:ovar-com and Final Map approvals and other discretionary application <br /> approvals); construction stage (prior in building permit issuance): O: Operational stage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.