My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013380
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
0
>
2600 - Land Use Program
>
GP-89-11
>
SU0013380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 4:22:18 PM
Creation date
6/2/2020 4:07:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013380
PE
2600
FACILITY_NAME
GP-89-11
STREET_NUMBER
0
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376-
APN
20904003
ENTERED_DATE
5/29/2020 12:00:00 AM
SITE_LOCATION
PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA—BUSINESS, TRANSPORTATION AND HOUSING AGENCY GEORGE DEUKMEJIAN, GoVernor <br /> DEPARTMENT OF TRANSPORTATION <br /> P.O. BOX 2048 (1976 E. CHARTER WAY) <br /> i <br /> STOCKTON, CA 95201 <br /> TDD (209) 948-7853 <br /> DECEIVED <br /> (209)948-7936 <br /> FEB 17 1989 <br /> February 14, 1989 SAN JOAQUIN COUNTY 10-SJ-205 <br /> San Joaquin County <br /> PLANNING DIVISION Mountain House <br /> Preapplication <br /> Ms. Kitty Walker <br /> San Joaquin County Planning <br /> 1810 E. Hazelton Avenue <br /> Stockton, CA 95205 <br /> Dear Ms. Walker: <br /> Caltrans has reviewed the preapplication review document of the proposed <br /> new town, Mountain House, and offers the following: <br /> A development of this size will have a significant impact on Routes 205 and <br /> 580 and various interchanges, especially Patterson Pass Road Interchange on <br /> Route 205. The project will also impact SR 4 northwest of the project site. In <br /> order to adequately assess the impacts a traffic analysis needs to be prepared. <br /> It should include the following: <br /> - An estimation of the projects total trip generation using recognized <br /> trip generation factors. <br /> - The analysis should include at a minimum the existing traffic, the <br /> project related traffic, the cumulative traffic, along with Am/PM <br /> peak hour turning movements. This analysis should include project <br /> related and cumulative impacts to mainline Routes 205 and 580 and <br /> interchanges in the project vicinity. <br /> An estimation of the directional distribution of the project trips. <br /> This analysis should consider local connecting roads and inter- <br /> changes in the adjacent area. This would include traffic studies <br /> for interchanges and I-205 mainline currently being prepared as <br /> part of the Tracy I-200 Specific Plan. <br /> An evaluation of the project's traffic impact on the Level of Service <br /> (LOS) of the key intersections and interchange ramps and ramp in- <br /> tersections in the area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.