Laserfiche WebLink
Susan Goodwin, with David Taussig and Associates, 1337 Howe Avenue, <br /> in Sacramento, representing the applicant, was present to address <br /> the Fiscal and Financial Sections of the Draft EIR. She made the <br /> following points: <br /> Regarding Section 4 . 9 (Fiscal Section) of the Draft EIR: <br /> • The fiscal analysis shows that only 40% of the nonresidential <br /> acreage is developed by the year 2010. The hotel never devel- <br /> ops, which reduces sales tax revenues and the transient occu- <br /> pancy tax revenues; the commercial/industrial property is not <br /> resold throughout the 17-year project period. <br /> • She listed some items which, she said, should have been <br /> included in the fiscal analysis: At the current rate that the <br /> County collects, the project would generate over $600, 000 <br /> annual recurring surplus at buildout. <br /> • Including other technical data, the projected County surplus <br /> in the year 2010 would be over $9. 5 million. <br /> • She showed charts of portions of her report. <br /> • She said that Mountain House will be a fiscally balanced <br /> project and it stands to be a project that generates surplus <br /> revenues to the County. <br /> Regarding Section 4 . 10 (Financial Section) of the Draft EIR: <br /> • Mountain House is a financially viable and a financially <br /> balanced project. <br /> • They see no extraordinary infrastructure requirements that <br /> would make any phase of Mountain House a financially infeasi- <br /> ble project. <br /> • They see a very basic allocation of costs. There are many <br /> financing options available that will provide a more fair <br /> allocation to nonresidential land uses. It is likely that a <br /> combination of the financing options will be used on Mountain <br /> House. <br /> Steve Picki-Al, with Korve Engineering, 155 Grand Avenue, Oakland, <br /> a transportation consultant on the project, was present and made <br /> the following comments: <br /> Regarding the Transportation Section of the Draft EIR: <br /> • The report can be misleading in that it would lead one to <br /> believe that the project would make a more significant <br /> contribution to long-term traffic growth on the regional <br /> network of freeways and roadways than it actually does. <br /> • Severe impacts on the traffic arena are fairly specifically <br /> located and are not distributed uniformly across the southern <br /> part of the County. <br /> • He showed tables and graphs to support his statements and said <br /> that the Final EIR should provide more objective tables and <br /> graphs on the traffic impact. <br /> Steve Atkinson, with the firm of Baker and McKinsey, in San <br /> Francisco, representing the applicant made the following comments: <br /> PC MINUTES -2- JAN 16, 1992 <br />