My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2200 - Hazardous Waste Program
>
PR0516545
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 7:04:53 AM
Creation date
6/3/2020 9:07:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0516545
PE
2220
FACILITY_ID
FA0004001
FACILITY_NAME
NAVAL COMMUNICATION STA*
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16203007
CURRENT_STATUS
02
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2220_PR0516545_305 W FYFFE_FILE 2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. CLOSURE PLAN <br /> 1. Closure Plan and Performance Standard <br /> The Permittee shall close the facility in accordance with the <br /> Closure Plan, Section XIII of the Part B Application, as required <br /> by 40 CFR 264.111 and 40 CFR 264.178. [40 CFR 264.111 and 40 CFR <br /> 264.178) <br /> 2. Amendment to Closure Plan <br /> The Permittee shall amend the Closure Plan in accordance with <br /> 40 CFR 264.112(c) whenever necessary. [40 CFR 264.112(c) ] <br /> 3. Notification of Closure <br /> The Permittee shall notify the Director at least forty-five (45) <br /> calendar days prior to the date the facility expects to begin <br /> closure. [40 CFR 264.112(d) ) <br /> 4. Time Allowed for Closure <br /> a. Within ninety (90) calendar days after receiving the final <br /> volume of hazardous wastes, the Permittee shall treat or <br /> remove from the site all hazardous waste remaining in <br /> storage in accordance with the Closure Plan, Section XIII of <br /> the Part B Application, as required by 40 CFR 264.113(a) . <br /> (40 CFR 264.113(a) ) <br /> b. The Permittee shall complete facility closure activities in <br /> accordance with the Closure Plan, Section XIII of the Part B <br /> Application, as required by 40 CFR 264.113 (b) , within one <br /> hundred and eighty (180) calendar days after receiving the <br /> final volume of hazardous waste. [40 CFR 264.113(b) ) <br /> 5. Disposal or Decontamination of Equipment, Structures and Soils <br /> At closure, the Permittee shall remove all hazardous wastes and <br /> hazardous waste residues from, and shall decontaminate or <br /> dispose, all facility equipment and structures , in accordance <br /> with the Closure Plan, Section XIII of the Part B Application, as <br /> required by 40 CFR 264.114. (40 CFR 264.114) <br /> 6. Certification of Closure <br /> When closure is completed, the Permittee shall submit to the <br /> Director, certification both by the Permittee and by an <br /> independent professional engineer registered in California that <br /> the facility has been closed in accordance with the <br /> specifications in the Closure Plan, Section XIII of the Part B <br /> Application, as required by 40 CFR 264.115. [40 CFR 264.115] <br /> 111.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.