My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COMMERCE
>
250
>
2200 - Hazardous Waste Program
>
PR0518027
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 5:20:37 AM
Creation date
6/3/2020 9:13:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0518027
PE
2220
FACILITY_ID
FA0013658
FACILITY_NAME
THE HOME DEPOT STORE #1006
STREET_NUMBER
250
STREET_NAME
COMMERCE
STREET_TYPE
AVE
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
250 COMMERCE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2220_PR0518027_250 COMMERCE_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garden Department (D-28) SAF 09-65 Handling Hazardous Materials <br /> Step Action <br /> 1 An associate in the Garden Department must walk the fertilizer aisle <br /> each day.All fertilizer aisles must be swept by no later than 10:00 a.m.in <br /> all stores daily. <br /> 2 During the walk,remove any regular trash items (such as, pallet <br /> splinters,paper,soda cans) that have not come in contact with fertilizer. <br /> Once collected,these items may be placed in the municipal (general) <br /> trash for disposal. <br /> 3 Next,the associate must: <br /> • Repair any damaged bags with bag patches or overpack the torn bags <br /> that cannot be patched for discounted sale(see procedures for <br /> "Handling Torn or Ripped Bags of Fertilizer" below). <br /> • Sweep the entire fertilizer aisle(being careful to collect any spilled <br /> fertilizer from the torn bags).Consolidate the floor sweepings into a <br /> pile. (See step 5 on page 19 for how to handle the floor sweepings.) <br /> NOTE: Before sweeping the floor, the associate must put on a pair of <br /> single-use gloves and safety glasses. <br /> An example of how a properly maintained fertilizer aisle should look is <br /> provided below. <br /> Revised: 12 January 2007 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.