Laserfiche WebLink
R <br />9 <br />shop shall be protected with fire sprinklers when it is 3,ODO square feet <br />or greater in size. <br />DEPA OF PUBUC, WORKS; (Contact Person: Tom twamiya, 468-3000) <br />a. An encroachment permit shall be required for work ; within the road right -d -way. <br />(Development Title Section 9-1145.4) <br />b. The driveway approach shall be Improved in accordance with the requirements of San <br />Joaquin County Standard 8-17 prior to issuance of the Occupancy permit. (DeVeloptnerTj <br />Title Section 9-1146.6) <br />The Traffic Impact Mitigation Fee will berequired for this development. The <br />and payable at the time of building permit applicafion. The fee currently is $561 .00 per <br />1,000 gross square feet of building designated as 'Manufacturing' in the Manteca area. <br />The fee shall be automatically adjusted July I of each year by the Engineering <br />Construction Cost Index as published by the Engineerfng� News Record. Afeecredittrom <br />one parcel to the other may be allowed If transfer and relinquishment of Me credit is <br />made by a written agreement between the owner and the County. (Resolutions R-90-304, <br />R-91-1025, R-93-167, R-94-174. and R-95-6 <br />(Contact Persom Jeff Carruesco, 468-3438) <br />a. Construction of an individual sewage disposal system under permit and inspection by the <br />Environmental Health Division Is required at the time of development. (Development Title <br />Sections 9-1110.3 and 9-1110.4) <br />State on revised plans or improvement plans the maximum number of employees <br />sewage disposal system is being designed for and that the leach field area will be <br />barricaded so that it cannot be driven over, parked on, or used as a storage area. This <br />leach field area must be used for that specific purpose only and cannot contain any <br />underground utility lines. (Development Title Section 9-1110.4(c)(5)) <br />irmation from the water providers tha <br />The applicant shall provide written conti <br />improvements have been constructed or financial arrangements have been made for arvy <br />improvements required by the agency and that the agency has or will have the capacity <br />to serve the proposed development. Said written confirmation shall be submitted prior <br />to the issuance of a building permit. (Development Title Section 9-1100.3) <br />d. If hazardous material is stored on the site, the applicant must register with the County <br />Office of Emergency Services. <br />If floor drains are required, they must be plumbed through a sandloil separator and <br />discharged to an above -ground system approved by ft Environmental Health Division. <br />This system rn.W'be_designqd by.gregisterpO engineer, The material collected in the— <br />above-ground holding system must be analyzed for hazardous constituents prior to <br />disposal. Specific test requirements may be obtained from the Environmental Health <br />Division, A $156.00 plan check fee Is required at the time of submittal. <br />twt <br />RECF1V'=r), <br />Conditions of Approval -4- JUN 0 2 2014 UP -95-12 <br />r-NVIRONmEtv tAL. - <br />F- M <br />