My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1 2003-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2200 - Hazardous Waste Program
>
PR0522168
>
COMPLIANCE INFO_FILE 1 2003-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 6:24:55 PM
Creation date
6/3/2020 9:20:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1 2003-2007
RECORD_ID
PR0522168
PE
2226
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2226_PR0522168_4704 FITE_FILE 1 2003-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC PLAN Stockton Center 21 <br /> The tanks are placarded in accordance with UFC 79.110 and UFC Standard No. 79-3 <br /> identifying the contents of the tank. <br /> Facility Tank Truck Unloading <br /> There is employee oversight during any delivery or draining Operations: <br /> - No tanks are filled without first checking the available reserves. <br /> All transfers of fluids from the trucks to the tanks or the tanks to the trucks are, <br /> continuously attended both by the tank truck driver and Martin-Brower personnel. All hoses <br /> on the tank truck are to have caps. If the tanker's hoses do not have caps, the vendor will <br /> not be allowed to deliver until the caps are obtained. <br /> .0 GENERAL SPCC PROGRAM RESPONSIBILITIES. <br /> The Operations Manager is responsible for the implementation of the SPCC Plan. The <br /> Service Manager may be designated as Coordinator of this program. <br /> Duties and Responsibilities of the SPCC Coordinator include: <br /> 1. Identify materials and wastes involved in a spill or release. <br /> 2. Coordinates spill response or clean-up activities <br /> a. activate spill procedures <br /> b. assess health and environmental hazards <br /> C. take reasonable steps to stabilize the situation. <br /> 3. Notify Manager and proper authorities. <br /> 4. Identify potential spill sources and implement preventative steps to <br /> eliminate or reduce spill or release risks. <br /> 5. Conduct facility inspections, monitoring or testing. <br /> 6. Train and review SPCC procedures with shop employees. <br /> 7. Establish revisions to the SPCC Plan as needed to meet the needs of <br /> the facility changes or revisions. <br /> 8. Make recommendations to corporate management for revisions to the <br /> overall plan as deemed necessary. <br /> -16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.