My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3003
>
2200 - Hazardous Waste Program
>
PR0513715
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 7:16:56 AM
Creation date
6/3/2020 9:20:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0513715
PE
2227
FACILITY_ID
FA0004400
FACILITY_NAME
STOCKTON STEEL CO
STREET_NUMBER
3003
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618002
CURRENT_STATUS
01
SITE_LOCATION
3003 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0513715_3003 E HAMMER_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P1 <br />03/08/05 16:32 <br />T29259 368 ENTRIX INC. <br />Excellence in Envimamenral Consufting 5lnce 1984 <br />590 Ygnscin Valley Rd., Suite 200 <br />Walnut Creek, CA 94596 <br />(925)935-9920 <br />FAX (925) 935-5358 <br />March 8, 2005 <br />Stockton Steel <br />P.Q. Cox 8429 <br />Stockton, California 95208 <br />Attn: Mr. Derric Juane <br />Re_ proposal for SPCC Services <br />Dear Mr. Juano <br />ENTRIX Inc. (ENTMX) is pleased to provide Stockton Steel in Stockton, California with <br />this proposal to prepare a Spill Prevention Control and Countermeasure Plan (SPCC)_ The <br />SPCC; Plan is required by Federal EPA regulations (40CFR Part 112) which arc applicable to <br />Stockton Steel because it stores more than 1,320 gallons or oil (fuel and automotive fluids) in <br />aboveground storage tanks. <br />Pre <br />ENTRIX will prepare the SPCC Plan in accordance with the current applicable requirements <br />of 40 CFR 112, as revised effective July 17, 2002. Completion of the plan will involve the <br />following steps: <br />1- A detailed facility inspection by an ENTRLX representative experienced in SPCC Plan <br />preparation, to assess oil storage, handling and receiving/dispensing practices as well as <br />facility drainage, security, record keeping, etc_; <br />2. Preparation of suitable tank inspection, tank testing, employee training, and other SPCC <br />required programs, to the extent that such programs do not already exist. The tank testing <br />program, if required, will be in accordance with guidelines of the Steel Tank Institute. <br />3. Preparation of a draft SPCC Plan and diagrams based on the facility ins-pection; <br />4. Completion of the EPA Substantial Harm Criteria Checklist (For the oil quantities at <br />Stockton Steel this is a formality: It determines if a facility is required to have a Facility <br />Response Plan (FRP). In practice EPA looks for this form during SPCC inspections; <br />LLLL <br />LLLL <br />LLLL <br />LLLL <br />0 002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.